Electric Ramps at the Old Centre | Roberto Ercilla Arquitectura

Vitoria-Gasteiz / Spain / 2007

40
40 Love 4,925 Visits Published
Electric Ramps at the Old Centre [ENG] [ENG] - The project comes about from an idea competition organized by the City of Vitoria.The program contemplates the creation of covered mechanical ramps, four sections in Cantón de la Soledad and three sections in Cantón de San Francisco Javier. The decision to cover the ramps allows a better guaranteed use, given the extreme winter conditions in Vitoria. The covering will be both complex and simple. It is complex in its apparent three-dimensional perception and simple as it is conceived from equal pieces, uniquely displaced among themselves. The basic stainless steel and glass portico acts similarly to the shots of a film, by means of rotary movements around a virtual axis in sequences of one metre distances. The sensation of rotational movement that the user perceives uses the movement of the ramp itself to create a connected sequence that holds one's interest all the way up, creating different views in different places along the way. The permanent exterior vision through the glass contributes to this sensation produced by the continuous turning of the porticoes.On the outside, the lines of glass that connect different positions of the porticoes make up an apparent complex and dynamic three-dimensional figure, though there is only one portico and thus a simple and rational construction process.
40 users love this project
Comments
View previous comments
    comment
    user
    Enlarge image

    Electric Ramps at the Old Centre [ENG] [ENG] - The project comes about from an idea competition organized by the City of Vitoria.The program contemplates the creation of covered mechanical ramps, four sections in Cantón de la Soledad and three sections in Cantón de San Francisco Javier. The decision to cover the ramps allows a better guaranteed use, given the extreme winter conditions in Vitoria. The covering will be both complex and simple. It is complex in its apparent three-dimensional...

    Project details
    • Year 2007
    • Work finished in 2007
    • Main structure Steel
    • Client City Hall Vitoria-Gasteiz
    • Contractor EBA
    • Cost 3.685.475
    • Status Completed works
    • Type Bridges and Walkways
    Archilovers On Instagram
    Lovers 40 users