Shanghai éolienne | Mahmoud ghedjatti
Shanghai / China / 2012
4
Shanghai Park city
As plate intervention we selected four vacant lots to the north side of Suzhou Creek
Potential of the area of intervention
Located on the banks of the Suzhou River creek, drill through a network of major course,
The site is windy throughout the year and high rainfall
proposal
The proposal is based on the exploitation of natural potentials of the city, having the largest area of green space and use of plants for water treatment, minimizing themechanical movement within the site and use renewable Energy
- Organization and carvings
the proposal
1 - Commercial Area: on plates 1 and 3 along the river. form mainly of five towers (30floors / 125 m high)
2 - Mixed zone: on the deepest plates 2 and 4 form of commercial buildings along theriver and the residential structures within a multipurpose room and
- Circulation
The mechanical movement within the site is limited to service vehicles
The proposed basement car parks at the edge of the site
- Greenery
80% of the area will be green space, floor or roof garden
The roof of the residential area will be a Green Park
A green band connects the four plates on along the river
- Renewable energy
The use of photovoltaic panels on roofs and facades on sloped
The location of wind turbines atop towers
Put generators floating on the river walk by the force of water movement
- The architectural idea
The shape of the project is guided by the plain and mountains of southern China
4 users love this project
Enlarge image
Shanghai Park city As plate intervention we selected four vacant lots to the north side of Suzhou Creek Potential of the area of intervention Located on the banks of the Suzhou River creek, drill through a network of major course, The site is windy throughout the year and high rainfall proposal The proposal is based on the exploitation of natural potentials of the city, having the largest area of green space and use of plants for water treatment, minimizing themechanical movement within the...
- Year 2012
- Main structure Reinforced concrete
- Status Unrealised proposals
- Type Apartments / Office Buildings / Offices/studios
comment