Shanghai éolienne | Mahmoud ghedjatti

Shanghai / China / 2012

4
4 Love 981 Visits Published
Shanghai Park city As plate intervention we selected four vacant lots to the north side of Suzhou Creek Potential of the area of intervention Located on the banks of the Suzhou River creek, drill through a network of major course, The site is windy throughout the year and high rainfall proposal The proposal is based on the exploitation of natural potentials of the city, having the largest area of green space and use of plants for water treatment, minimizing themechanical movement within the site and use renewable Energy - Organization and carvings the proposal 1 - Commercial Area: on plates 1 and 3 along the river. form mainly of five towers (30floors / 125 m high) 2 - Mixed zone: on the deepest plates 2 and 4 form of commercial buildings along theriver and the residential structures within a multipurpose room and - Circulation The mechanical movement within the site is limited to service vehicles The proposed basement car parks at the edge of the site - Greenery 80% of the area will be green space, floor or roof garden The roof of the residential area will be a Green Park A green band connects the four plates on along the river - Renewable energy The use of photovoltaic panels on roofs and facades on sloped The location of wind turbines atop towers Put generators floating on the river walk by the force of water movement - The architectural idea The shape of the project is guided by the plain and mountains of southern China
4 users love this project
Comments
View previous comments
    comment
    user
    Enlarge image

    Shanghai Park city As plate intervention we selected four vacant lots to the north side of Suzhou Creek Potential of the area of intervention Located on the banks of the Suzhou River creek, drill through a network of major course, The site is windy throughout the year and high rainfall proposal The proposal is based on the exploitation of natural potentials of the city, having the largest area of green space and use of plants for water treatment, minimizing themechanical movement within the...

    Project details
    • Year 2012
    • Main structure Reinforced concrete
    • Status Unrealised proposals
    • Type Apartments / Office Buildings / Offices/studios
    Archilovers On Instagram
    Lovers 4 users