Puerta del Mar School | Antonio Palenzuela

Algeciras / Spain / 2023

0
0 Love 61 Visits Published

The new extension of the Puerta del Mar School in Algeciras (Spain) is an individual piece that differs in material and color from the original building. The new extension joins two parts of the old school, which was a seventies construction built as a student residence.

In the nineties, the residence was turned into a kindergarten and elementary school. Therefore, this typology is not usual in school buildings, since it is a four-story building with different heights between them, which causes problems of accessibility and communication between classrooms.

For this reason, the new building is planned as an individual construction with ramps and an elevator as a solution to accessibility problems. The new volume does not want to merge with its surroundings, it has its own materiality. For this purpose, exposed brick was chosen as a material that combines solidity and aesthetics.

The new prism is built with bright green exposed brick and is an abstract and silent volume but influenced by the Islamic past of Algeciras, in ancient times known as Green Island. the brightness is due to the glazed brick has been used since ancient times in Spain and in the Mediterranean culture.

All the facades are built with glazed exposed brick, in addition they become lattice in front of the windows, forming an almost sculptural image. The lattices are a secure facade that allows natural light to enter the interior of the building, in addition to protecting from the sun in summer to achieve a better climatic performance.

0 users love this project
Comments
    comment
    user
    Enlarge image

    The new extension of the Puerta del Mar School in Algeciras (Spain) is an individual piece that differs in material and color from the original building. The new extension joins two parts of the old school, which was a seventies construction built as a student residence. In the nineties, the residence was turned into a kindergarten and elementary school. Therefore, this typology is not usual in school buildings, since it is a four-story building with different heights between them, which causes...

    Project details
    • Year 2023
    • Work started in 2021
    • Work finished in 2023
    • Main structure Mixed structure
    • Client Andalousian Government
    • Contractor Hijos de Manuel Molina S.C.A.
    • Cost 926.789,85 €
    • Status Completed works
    • Type Schools/Institutes