LOCOMOTIVE | Enrico Thanhoffer

The two front windows are "the sidewalks waiting for the train," with the iron beams that "carry" the shelter. Como / Italy / 2008

0
0 Love 12,412 Visits Published
The construction of a new building for use by pharmacy and doctors' offices, involved the demolition of the old building and the construction of a new building. The freedom of design / architectural level planovolumetrico was little. When the architect visited the site for the first time, he immediately thought that the only solution was to build the "wagon" of a train, then decided to draw "a shelter at the head station with the train stopped at the platform." With the same proportions of a shelter built the railway building project. The two front windows are "the sidewalks waiting for the train," with the iron beams that "carry" the shelter. On the sides of the building, "the locomotive of the train" a sequence of rain in excess of windows, convey the impression that the track came a train load of drugs ....
0 users love this project
Comments
    comment
    user
    Enlarge image

    The construction of a new building for use by pharmacy and doctors' offices, involved the demolition of the old building and the construction of a new building. The freedom of design / architectural level planovolumetrico was little. When the architect visited the site for the first time, he immediately thought that the only solution was to build the "wagon" of a train, then decided to draw "a shelter at the head station with the train stopped at the platform." With the same proportions of a...

    Project details
    • Year 2008
    • Work started in 2006
    • Work finished in 2008
    • Status Completed works
    Archilovers On Instagram