WATERFRONT | LDARCHITECTS

WATERFRONT SAN BARTOLOMEO AL MARE San Bartolomeo al Mare / Italy / 2011

0
0 Love 72 Visits Published

The project follows a generalized extension of the promenade, through the creation of an open spaces' system, spaces which are themed and of high attractive value, dislocated along the path with constant frequency, and which become the new entrances from the city to the promenade. The public space’s design is easy and adaptable to every seasonal requirements. It interacts with the seashore’s system, which begins to belong physically to the promenade becoming a new pedestrian space.


--------------------------------------------------------


Il progetto persegue un ampliamento generalizzato della passeggiata, attraverso la creazione di un sistema di piazze/spazi aperti, tematizzati e di grande valore attrattivo, dislocati lungo il percorso con una frequenza costante, che diventano i nuovi ingressi alla passeggiata dalla città esistente.
Il disegno dello spazio pubblico è semplice, adattabile alle diverse esigenze stagionali. Interagisce con il sistema della spiaggia, che ri-appartiene fisicamente alla passeggiata diventando nuovo spazio pedonale.


 


TEAM
Architects: L. Dolmetta, N. Pisani, M. Vallino
Engineers: Bussetti & Cozzi, SALP s.n.c., Morandi Associati, G. Rebuttato
Team: L. Wegner, C. La Regina, L. Monarca
Client: Municipality of Comune di San Bartolomeo al Mare (Im)

0 users love this project
Comments
    comment
    user
    Enlarge image

    The project follows a generalized extension of the promenade, through the creation of an open spaces' system, spaces which are themed and of high attractive value, dislocated along the path with constant frequency, and which become the new entrances from the city to the promenade. The public space’s design is easy and adaptable to every seasonal requirements. It interacts with the seashore’s system, which begins to belong physically to the promenade becoming a new pedestrian...

    Project details
    • Year 2011
    • Work started in 2009
    • Work finished in 2011
    • Client Comune di San Bartolomeo al Mare
    • Status Completed works
    • Type Parks, Public Gardens / Public Squares / Waterfront / Urban Furniture / Monuments / River and coastal redevelopment
    Archilovers On Instagram