Residence Bathrooms Renovation | Alshema Mousa

Khartoum / Sudan / 2022

0
0 Love 128 Visits Published

Design & Build renovation project off two residential bathroom in one of the oldest residential neighbourhood in Khartoum Sudan. The Bathrooms was firstly built in the early 1980s and most of the hidden piping and fittings were rosted steel and galvanised pipes. The new layout was proposed to fit the purposes of the residents of the single family residence, where most of the bathroom fixtures and fittings are international standardised brands.

0 users love this project
Comments
    comment
    user
    Enlarge image

    Design & Build renovation project off two residential bathroom in one of the oldest residential neighbourhood in Khartoum Sudan. The Bathrooms was firstly built in the early 1980s and most of the hidden piping and fittings were rosted steel and galvanised pipes. The new layout was proposed to fit the purposes of the residents of the single family residence, where most of the bathroom fixtures and fittings are international standardised brands.

    Project details
    • Year 2022
    • Work started in 2022
    • Work finished in 2022
    • Main structure Reinforced concrete
    • Contractor Alshema Abbas Architecture
    • Cost $ 15,000
    • Status Completed works
    • Type Single-family residence / Interior Design / Waterworks/Water Systems / Building Recovery and Renewal
    Archilovers On Instagram