University of California Los Angeles Engineering VI Phase 1 | Moore Rube Yudell

A Modern Facility for the Rapidly-Shifting Worlds of Engineering and Applied Sciences Los Angeles, California / United States / 2016

0
0 Love 140 Visits Published

Engineering VI is the new flagship facility for the Henry Samueli School of Engineering and Applied Science (HSSEAS). The new building strategically links to Engineering V, Engineering IV and the main campus entry, unifying these important and related facilities. Its front entry faces Westwood Plaza to the west and the Portola Steps to the north, reinforcing key existing pedestrian routes. Its prominent location emphasizes HSSEAS’s highly visible presence, and will be a symbol of UCLA’s HSSEAS. Among important guiding principles for the building are a commitment to state-of-the-art engineering research, a mission to explore energy efficiencies strategies, encouragement of scientific collaboration, and other opportunities inherent in the site. Engineering VI is comprised of two phases – the 60,000 square feet Phase I known as the WIN-GEM, Western Institute of Nanoelectronics and Green Engineering Metrology, building and currently in detailed development and Phase II – developed during a concept phase. When completed, the two buildings will provide up to 150,000 gross square feet. Engineering VI will provide flexible wet and dry research laboratories, faculty, graduate and post-doc offices, conference spaces, interaction space of various configurations, and an Auditorium/Large Lecture Hall.


The Auditorium/Large Lecture Hall includes approximately 250 seats, has multi-function capabilities and is joined by adjacent flexible meeting spaces. The Auditorium is placed strategically on the ground floor and will be readily accessible from the entry lobby, to support the daily life of the School and allow various kinds of special events. Engineering VI also incorporates attractive outdoor spaces that are highly useful and provide natural light and ventilation, as well as generous windows to create a pleasant place. Joining the collection of outdoor rooms is a network of interior circulation routes, such as open stairs and passageways. The building’s many physical connections help foster interaction that is vital to modern scientific pursuits.

0 users love this project
Comments
    comment
    user
    Enlarge image

    Engineering VI is the new flagship facility for the Henry Samueli School of Engineering and Applied Science (HSSEAS). The new building strategically links to Engineering V, Engineering IV and the main campus entry, unifying these important and related facilities. Its front entry faces Westwood Plaza to the west and the Portola Steps to the north, reinforcing key existing pedestrian routes. Its prominent location emphasizes HSSEAS’s highly visible presence, and will be a symbol of...

    Project details
    • Year 2016
    • Work finished in 2016
    • Client University of California Los Angeles
    • Contractor S.J. Amoroso Construction Company
    • Status Completed works
    • Type Colleges & Universities
    Archilovers On Instagram