Reconstruction of the non-residential buildings for a scientific and information center | Nikolay Lyzlov

ООО "Lyzlov Architects""AML" Moscow / Russian Federation / 2018

0
0 Love 487 Visits Published

The purpose of the reconstructive measures is to create spaces for convenient placement of the main and auxiliary premises of the scientific and information center.


It is supposed with preservation of dimensions of existing buildings, dismantling of emergency structures and carrying out of reconstructive works on a complex of buildings.


The complex consists of two separate buildings connected by a single entrance group of rooms in the level of the ground floor, and an overhead transition in the level of the second one.
Building 1 - a three-story building with a basement and an attic with pitched roof. The building undergoes a complete redevelopment with the preservation of all, both internal and external walls. The original historical appearance is restored, the existing attic is being dismantled for this purpose.
- in the basement (page 1) premises of the engineering equipment of the complex (heat point, switchboard room, pumping rooms) are located.
-in the basement of the buildings 2 and 4 are located the premises of the entrance group, the parking lot for 34 parking spaces.
-the first, second floors of all buildings and the 3rd floor of the 1st building are occupied by the premises of the main purpose (working premises, offices).
- In the attic premises of the complex there is engineering equipment.

0 users love this project
Comments
    comment
    user
    Enlarge image

    The purpose of the reconstructive measures is to create spaces for convenient placement of the main and auxiliary premises of the scientific and information center. It is supposed with preservation of dimensions of existing buildings, dismantling of emergency structures and carrying out of reconstructive works on a complex of buildings. The complex consists of two separate buildings connected by a single entrance group of rooms in the level of the ground floor, and an overhead transition in...

    Project details
    • Year 2018
    • Work started in 2015
    • Work finished in 2018
    • Client RusAgroTrans
    • Status Current works
    • Type Government and institutional buildings / multi-purpose civic centres / Interior Design
    Archilovers On Instagram