RADIO HOUSE - BUILDING | Jean-Christophe Busnel
3000 people work dailly in it Paris / France / 2018
Turn-key project: design, installation, commissioning, maintenance.
Systems installed: Fire Detection system in all the building including the carparks, Automatic Extinguishing System (60 computer rooms with Inergen), 3D Supervision System.
Characteristics: we developped a specific discrete for the auditorium (soundless aspirating system) and a specific short e-beam detector for the prestigious rooms (installed in the walls with the same color than the wall).
Turn-key project: design, installation, commissioning, maintenance. Systems installed: Fire Detection system in all the building including the carparks, Automatic Extinguishing System (60 computer rooms with Inergen), 3D Supervision System. Characteristics: we developped a specific discrete for the auditorium (soundless aspirating system) and a specific short e-beam detector for the prestigious rooms (installed in the walls with the same color than the wall).
- Year 2018
- Work started in 2008
- Work finished in 2018
- Status Current works
- Type Government and institutional buildings / Office Buildings