DELFIN HEADQUARTER

Office + Production facility building Turin / Italy

2
2 Love 1,165 Visits Published

Turnkey project of the new Delfin headquarter and refurbishment of the existing industrial building.


The structure is made of steel prefab profiles and it’s been assembled on site thanks to the implementation of high resistance junctions.


Internally, you can find a total of seven calendered columns measuring 10 meters each. Leaning on the columns there’s a glass façade built with the spider-glass system.


The existing buildings have been covered by a black perforated laminated metal sheet.

2 users love this project
Comments
    comment
    user
    Enlarge image

    Turnkey project of the new Delfin headquarter and refurbishment of the existing industrial building. The structure is made of steel prefab profiles and it’s been assembled on site thanks to the implementation of high resistance junctions. Internally, you can find a total of seven calendered columns measuring 10 meters each. Leaning on the columns there’s a glass façade built with the spider-glass system. The existing buildings have been covered by a black perforated...

    Project details
    • Main structure Steel
    • Status Completed works
    • Type Office Buildings / Corporate Headquarters / Factories
    Archilovers On Instagram
    Lovers 2 users