Multifunctional Centre Pier

Primo classificato al ''Concorso di progettazione per la realizzazione del Centro Servizi Polivalente per usi portuali al Molo San Cataldo'' Taranto / Italy / 2016

24
24 Love 14,000 Visits Published

The retrieval of the S. Cataldo Pier as waterfront has the goal of reintegrating the city of Taranto with its port. The multipuropose Service Center Building, in its integration with the pier structure, establishes itself as the new “city gate” onto the sea. The concept is based on the idea of an architecture that starts from the ground and takes shape as a building path that allows an articulation into two architectural bodies, designed to create a new, dynamic, transitable “landscape”; easing and developing with a sinuous, organic gait, articulated around the open, service-equipped spaces, a Mediterranean garden and a hortus conclusus. The whole takes on a liquid form, a volume-path that, stretching out towards the sea, engulfs the end of the pier with the Statue of Saint Cataldo, the main point of the site, incorporating it into a new terraced base. The integration of the pier and the building is made concrete with an architecture replete with panoramic walkways, sloped, volume-forming paths that, like telescopes, frame the surrounding landscape, making the new Multipurpose Service Centre into a new pole of attraction not only for the city of Taranto but for the entire Gulf.

Gruppo vincitore primo premio:
Prof. arch. Rosario Pavia (capogruppo)
arch. Matteo di Venosa
arch. Guendalina Salimei, arch.Francesca Contuzzi (T-Studio)
Cooprogetti

24 users love this project
Comments
    comment
    user
    Enlarge image

    The retrieval of the S. Cataldo Pier as waterfront has the goal of reintegrating the city of Taranto with its port. The multipuropose Service Center Building, in its integration with the pier structure, establishes itself as the new “city gate” onto the sea. The concept is based on the idea of an architecture that starts from the ground and takes shape as a building path that allows an articulation into two architectural bodies, designed to create a new, dynamic, transitable...

    Project details
    • Year 2016
    • Work started in 2008
    • Work finished in 2016
    • Client Autorità portuale di Taranto
    • Status Current works
    • Type Waterfront / multi-purpose civic centres / Port Areas
    • Websitehttp://www.tstudio.net
    Archilovers On Instagram
    Lovers 24 users