SFR Headquarters | Jean-Paul Viguier

Saint-Denis / France / 2013

7
7 Love 1,317 Visits Published
Competition won in 2010 Client: SFR Developer: Vinci Immobilier Promotion Engineering firm: SETEC Bâtiment Surface area: 130,000 sq m Budget: €225 M + Tax Mandate: Design and delivery Certification : QHE construction (already obtained for the design phase), BREEAM "very good" and QHE exploitation, BBC Effinergie Label, summer comfort level rule Th-E, RT 2012 The new 130,000 sq m SFR headquarters in the Landy-Pleyel ZAC (mixed development zone) boasts nearly 8,500 employee workstations. The building, designed by Jean-Paul Viguier, "adopts the metaphor of the tree, which experiences continual growth and rebirth, adapting constantly to external conditions. The project takes the form of a campus, atop a trunk with protruding branches leading to terraces and large multi-level gardens." The principle is based on the idea of unity and union, with four main buildings presented both as a unified whole and as discrete spaces, in other words several buildings which must form a visual whole and reflect the corporate culture in detail: strong roots (the trunk) and various business units characterised by their diversity (the branches). Each element is linked horizontally for journeys promoting contact and communication. The emphasis is placed on building the relationship with the environment: the employees' workspace environment and the site's specific environment for genuine contextuality in an industrial landscape; and, with a light, breathing building, the relationship with the gardens that surround the building. Daylight is a key project component fostering pleasant working conditions and optimal energy efficiency, achieved partly by using alternate glass and metal components, with varying openings, reflection levels and densities to suit the space. The facades act like an item of clothing which changes in nature to suit the degree of exposure. Providing protection on the northern side against sound pressure from the main roads, cold and shade, the garment changes to the west and east with external blinds, glass containing aluminium for extra flexibility, and openings. To the south, facing the gardens, large horizontal overlaps protect against the sun and the partition walls directly adjoin the outer walls. Which is where the stairwells are located, facing the gardens, for permanent visual contact with the redesigned landscape. Shared services are grouped together on the ground floor for a smooth and active relationship with resource-rich common areas: several restaurants, fitness suite, squash courts, relaxation space, etc.
7 users love this project
Comments
    comment
    user
    Enlarge image

    Competition won in 2010 Client: SFR Developer: Vinci Immobilier Promotion Engineering firm: SETEC Bâtiment Surface area: 130,000 sq m Budget: €225 M + Tax Mandate: Design and delivery Certification : QHE construction (already obtained for the design phase), BREEAM "very good" and QHE exploitation, BBC Effinergie Label, summer comfort level rule Th-E, RT 2012 The new 130,000 sq m SFR headquarters in the Landy-Pleyel ZAC (mixed development zone) boasts nearly 8,500 employee...

    Project details
    • Year 2013
    • Status Current works
    • Type Corporate Headquarters
    Archilovers On Instagram
    Lovers 7 users