Fire Station and Barracks of Santo Tirso | Álvaro Siza Vieira

Santo Tirso / Portugal / 2013

87
87 Love 15,619 Visits Published
The Firefighters barracks matches the CB1 Type program and is located in Quinta de Geão, at the lot 28, of 4770 m2. The building comprises a total gross area of 1173 m2 and lodges the support functions to the fire brigade. Starting from the “Lobby – Access”, it is organized in 3 floors. It develops exclusively at the ground floor level in the continuity of the sector A, with its own access from the corner of the B and C streets, houses the tasks of the associative sector and comprises a total gross area of 145 m2: - Lobby – common to the sector A - Reception and board secretariat - Board room - Full accessibility sanitary Between sectors A and B there is a circulation space, open onto a courtyard, communicating with all building functions. In the terrain remaining space, between the building and the EN 104, lies the Operational Parade, of 914 m2, with access from the C street and directly from the car park. Next to the Operational Parade is located the Home-School (CE) and the workshop and washing (OL). The Honor Parade is located next to the building main façade from the C Street. Regarding the landscaping project and exterior arrangements, the proposal envisages the establishment of paved green areas that will serve as a framework and support space. The paved areas, excluding the car accesses and the terrace area outside the Bar, are coated with stone trimmed asphalt concrete. The green areas will be targeted for the existing vegetation reinforcement in the slope areas, proceeding to the replacement work of degraded species. Occasionally some trees will be brought, fed by an automatic irrigation system and flagged by boilers in the paved areas. Project coordinator: Arq. José Carlos Nunes de Oliveira Collaborators: Arq. Marco Rampulla, Arq. Pablo Elinbaum. Arq. Patrícia Teixeira . Arq. José Pedro Silva Structure project: Eng.º Jorge Nunes da Silva, Eng.ª Raquel Dias Electricity and security project: Eng.º Alexandre Martins HVAC project: Eng.º Raul Bessa Water and Sanitation project: Eng.º Raquel Fernandes
87 users love this project
Comments
    comment
    user
    Enlarge image

    The Firefighters barracks matches the CB1 Type program and is located in Quinta de Geão, at the lot 28, of 4770 m2. The building comprises a total gross area of 1173 m2 and lodges the support functions to the fire brigade. Starting from the “Lobby – Access”, it is organized in 3 floors. It develops exclusively at the ground floor level in the continuity of the sector A, with its own access from the corner of the B and C streets, houses the tasks of the associative sector and comprises a total...

    Project details
    • Year 2013
    • Work finished in 2013
    • Client Associação Humanitária Bombeiros Voluntários de Santo Tirso
    • Contractor EMPRIPAR, Obras Pública e Privadas S.A.
    • Status Completed works
    • Type Military barracks, police and fire stations
    Archilovers On Instagram
    Lovers 87 users