AL-Hejrah Hotel | Ibraheem Joharji

2012 iLines Architectural work | www.iLinesArch.com Mecca / Saudi Arabia / 2012

1
1 Love 1,066 Visits Published
It entail and challenging new design, Mount area 43,000 cubic meters must be removed to build the project place, that our goal in this project, green architecture we want to be the biggest challenge is that the design is based Bahma size and succeed in employment, that respect for nature mountain city of Mecca is another optionas well as the mountainous terrain respect of respect for the site, in the end, a good score 27,000 buildings and 438 hotel rooms amid the mountain ... Will be drawn by the great housing there
1 users love this project
Comments
    comment
    user
    Enlarge image

    It entail and challenging new design, Mount area 43,000 cubic meters must be removed to build the project place, that our goal in this project, green architecture we want to be the biggest challenge is that the design is based Bahma size and succeed in employment, that respect for nature mountain city of Mecca is another optionas well as the mountainous terrain respect of respect for the site, in the end, a good score 27,000 buildings and 438 hotel rooms amid the mountain ... Will be drawn by...

    Project details
    • Year 2012
    • Work started in 2012
    • Contractor JOHARJI EAMAR
    • Status Completed works
    • Type Hotel/Resorts
    Archilovers On Instagram
    Lovers 1 users