Showroom Kitchen Munich
Event and live Cooking Kitchen for TV and Showroom Munich / Germany / 2010
2
This was a challenging Project in 2010.
It took 5 Months from Designing to Completion.
Some Neat Features:
- All Front Panels Doors and Side Panels are made out of robust Glass with Stainless Steel Frames
- Island is supported by a 1cm Thick Sword out of Stainless Steel
- 2 Cooktops facing each other for Cook-Offs and Battles
- 2 Ventilation systems one integrated in the Bottom Cabinets (Bora) The second one in the Hovering Cube (O+F Plasma Norm Filtration System) the challenge was to drill 9 Holes in the 180cm glass front panel for the Control Knobs of the Bora System
- 3 Black Monoliths housing each different Appliances (Miele Gaggenau Kitchenaid) The Doors are Slideable and Roll Back into the Wall
- All Glass Panels for Protection and easy color Changing
- Double Sinks with Two Faucets Eisinger
It took 5 Months from Designing to Completion.
Some Neat Features:
- All Front Panels Doors and Side Panels are made out of robust Glass with Stainless Steel Frames
- Island is supported by a 1cm Thick Sword out of Stainless Steel
- 2 Cooktops facing each other for Cook-Offs and Battles
- 2 Ventilation systems one integrated in the Bottom Cabinets (Bora) The second one in the Hovering Cube (O+F Plasma Norm Filtration System) the challenge was to drill 9 Holes in the 180cm glass front panel for the Control Knobs of the Bora System
- 3 Black Monoliths housing each different Appliances (Miele Gaggenau Kitchenaid) The Doors are Slideable and Roll Back into the Wall
- All Glass Panels for Protection and easy color Changing
- Double Sinks with Two Faucets Eisinger
2 users love this project
Enlarge image
This was a challenging Project in 2010. It took 5 Months from Designing to Completion. Some Neat Features: - All Front Panels Doors and Side Panels are made out of robust Glass with Stainless Steel Frames - Island is supported by a 1cm Thick Sword out of Stainless Steel - 2 Cooktops facing each other for Cook-Offs and Battles - 2 Ventilation systems one integrated in the Bottom Cabinets (Bora) The second one in the Hovering Cube (O+F Plasma Norm Filtration System) the...
- Year 2010
- Client Dreier Kuechenkonzepte
- Status Completed works
- Type Showrooms/Shops / Custom Furniture
comment