t_7 house | ARCH.625
Moscow / Russian Federation / 2010
33
The rapidly erected country house, industrial methods of designing and building are applied to private housing, the dimensions multiple of glued panels in accordance with GOST, it has allowed to realize the project under a key basis in the period less than 4 months.
The purposes – to enter a low-rise housing in a landscape, to make it invisible as much as possible. The style of the 30 - 40s of the last century taken as the basis for design. The main component of the orientation of the house is insolation and geomancy: taken into account all the directions, energy outputs for the owners of the houses, the garden of stones with the astral triangles and much more.
33 users love this project
Enlarge image
The rapidly erected country house, industrial methods of designing and building are applied to private housing, the dimensions multiple of glued panels in accordance with GOST, it has allowed to realize the project under a key basis in the period less than 4 months. The purposes – to enter a low-rise housing in a landscape, to make it invisible as much as possible. The style of the 30 - 40s of the last century taken as the basis for design. The main component of the orientation of the...
- Year 2010
- Work started in 2010
- Work finished in 2010
- Status Completed works
- Type Single-family residence
comment