Centre for Virtual Engineering ZVE Fraunhofer Institute | UNStudio

Stuttgart / Germany / 2012

30
30 Love 5,265 Visits Published
Located on the research campus of the Fraunhofer institute in Stuttgart Vaihingen, the Centre for Virtual Engineering ZVE specializes in the investigation of different multidisciplinary work flows. UNStudio worked in collaboration with Asplan from Kaiserslautern on the architectural services for the Centre. UNStudio was responsible for the design development, the required 3D-planning and implementation during all planning processes. Asplan was responsible for the development of the construction documents and the site supervision. All parts of the programme were implemented into the spatial organisation of the building. The diagrammatic approach employed combines the laboratory and research functions with the public exhibition areas and a scenographic routing of the visitors into an open and communicative building concept. The different working areas are distributed with regard to the needs of the employees. There are no spatially separated departments along the band of laboratories. Instead, working areas merge into each other, promoting interdisciplinary work practices. The scenographic visitors routing is also an essential element of the design. Visitors move from the multimedia entrance hall, up the stairs which diagonally cross the atrium. The stairs serve as a guiding line which is emphasised by the addition of a bright colour concept. Colour is used both in the facade and interior to distinguish the various programmatic elements, such as offices or laboratories. On the stairs a gradient is used to further aid in way-finding. In this way, not only a space of communication emerges but also an interface for visitors and employees. Returning to the starting point, the Virtual Reality area forms the highlight of the visitor tour. Construction and design elements are integrated within a coherent structure with open and closed elements. The geometry of the floor plan, consisting of curved and straight elements, dissolves into the saw tooth geometry of the facade whilst maintaining the effect of a continuously transforming surface. Gold certification from the DGNB (German Sustainable Building Council) An exceptional level of sustainability was a key consideration from the outset. The building structure partially consists of bubble deck ceilings, providing both an economical alternative to the more commonly used concrete ceilings and reduction in weight, allowing for column free spaces. Enhanced technical elements are also integrated into the structure: concrete core activation, false floors and the arrangement of the sprinkler tubes within the false floors minimises the amount of visible installations whilst maintaining their flexibility. The air supply to the deeper areas also occurs partly through air channels within the false floor. Air extraction occurs within the shafts. The plot for the Centre for Virtual Engineering ZVE has been used to its maximum in terms of development potential. The rounded shape and optimised building envelope provides a 7% smaller contour than that of a rectangular form of the same area. This also results in a better facade area to volume ratio. The amount of glass facade is only 32%. All spaces along the facade can be ventilated directly by operable window elements. Ceilings without any lintels make it possible for daylight to reflect deep into the spaces, which are additionally supported by daylight lamellas while the sun screens are down. All installations are located within accessible shafts. Low maintenance, separable, and recyclable materials have been used for the skeleton as well as for the interior and facade construction. The Centre for Virtual Engineering ZVE building has been awarded a Gold certification by the DGNB.
30 users love this project
Comments
View previous comments
    comment
    user
    Enlarge image

    Located on the research campus of the Fraunhofer institute in Stuttgart Vaihingen, the Centre for Virtual Engineering ZVE specializes in the investigation of different multidisciplinary work flows. UNStudio worked in collaboration with Asplan from Kaiserslautern on the architectural services for the Centre. UNStudio was responsible for the design development, the required 3D-planning and implementation during all planning processes. Asplan was responsible for the development of the construction...

    Project details
    • Year 2012
    • Work finished in 2012
    • Client Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V.
    • Status Completed works
    • Type Office Buildings
    Archilovers On Instagram
    Lovers 30 users