Olympic Stadium Kiev | gmp Architekten

The stadium will host the final match of Euro 2012 Kyiv / Ukraine / 2011

13
13 Love 5,398 Visits Published
On the occasion of the UEFA European Football Championships in 2012, which Ukraine is staging jointly with Poland, the rebuilding of the Olympic Stadium for the final game has been realized. The new design for the reconstruction of the stadium respects the historic fabric with its important filigree prestressed concrete upper tier built in 1968, the frame of the new roof structure being detached and placed clear of the existing bowl. This most distinctive feature is therefore being encased in a new filigree glass façade and will be duly illuminated with appropriate lighting. The plinth structure of 1948 arising from the location of the stadium on a slope at the West End also was rebuilt in a different guise during reconstruction. The geometry of the lower part of the stand was completely redesigned and updated in accordance with safety requirements. Particularly at the west end of the stadium, beneath the main stand, extensive premises were constructed for players, VIP guests and press representatives. After the conclusion of the European Football Championships in 2012, an athletics track will be inserted, enhancing the functionality of the stadium. When the glazed structure of the stadium is illuminated at night, it is an urban landmark in the cityscape of downtown Kiev. The interior of the stadium, with seats for around 68,000 people, gains an individual, unmistakable identity with a membrane roof structure incorporating air supports and domes of light. The new stadium was inaugurated on 8th October 2011, the first international match after the opening was held between Ukraine and Germany on 11th November 2011. Data of the Project Consultancy 2008 Design Volkwin Marg with Christian Hoffmann and Marek Nowak Project leader Martin Bleckmann Cooperation with Personal Creative Architectural Bureau Y. Serjogin Structural concept and design, roof schlaich bergermann und partner – Knut Göppert with Markus Balz and Thomas Moschner Structural engineering Kempen Krause Ingenieurgesellschaft Technical equipment b.i.g. Bechtold Ingenieurgesellschaft mbH Lighting design Conceptlicht Client National Sport Complex „Olympiysky“ Seats 68,000 Construction period 2009-2011
13 users love this project
Comments
View previous comments
    comment
    user
    Enlarge image

    On the occasion of the UEFA European Football Championships in 2012, which Ukraine is staging jointly with Poland, the rebuilding of the Olympic Stadium for the final game has been realized. The new design for the reconstruction of the stadium respects the historic fabric with its important filigree prestressed concrete upper tier built in 1968, the frame of the new roof structure being detached and placed clear of the existing bowl. This most distinctive feature is therefore being encased in...

    Project details
    • Year 2011
    • Work started in 2009
    • Work finished in 2011
    • Client National Sport Complex
    • Status Completed works
    • Type Stadiums
    Archilovers On Instagram
    Lovers 13 users