Graham house | o2 architecture

Palm Springs / United States / 2010

25
25 Love 4,032 Visits Published
This prefabricated steel home is remotely located in an area with limited access and great natural beauty. The program called for a modest residence that can be built and maintained with limited impact to the existing surroundings and free of ongoing maintenance. The home is elevated off the landscape on 8-steel columns that allow both the home and decks to float above the natural terrain. The continuous steel columns, extending from the footing to roof deck, form the key component of the building system's bolted moment resisting steel frame. The steel frame, building materials and systems, are prefabricated and transported “flat-packed” to the job site. With the system’s speed and efficiency this project was built over an 8 week period with minimal construction waste and disturbance. It is the latest home to utilize an established building system with the goal of greener, more efficient building through thoughtful design.
25 users love this project
Comments
    comment
    user
    Enlarge image

    This prefabricated steel home is remotely located in an area with limited access and great natural beauty. The program called for a modest residence that can be built and maintained with limited impact to the existing surroundings and free of ongoing maintenance. The home is elevated off the landscape on 8-steel columns that allow both the home and decks to float above the natural terrain. The continuous steel columns, extending from the footing to roof deck, form the key component of the...

    Project details
    • Year 2010
    • Work finished in 2010
    • Status Completed works
    • Type Single-family residence / Modular/Prefabricated housing
    Archilovers On Instagram
    Lovers 25 users