A business of Manifacturing Company | robert hoberdan
Sydney / Australia / 2011
0
Covering an area of 2320 m2 (6264 m3) the project is divided into three buildings: the central one includes the Presidency, while the two side buildings managers. The three buildings are connected to each other.
I publish on this site studies of the work that is under construction.
0 users love this project
Enlarge image
Covering an area of 2320 m2 (6264 m3) the project is divided into three buildings: the central one includes the Presidency, while the two side buildings managers. The three buildings are connected to each other. I publish on this site studies of the work that is under construction.
- Year 2011
- Work started in 2011
- Main structure Mixed structure
- Client Mr. Arold Smith
- Status Current works
- Type multi-purpose civic centres / Shopping Malls
comment