Park for All | VPS  ARCHITETTI

An inclusive park in Tempio Pausania Tempio Pausania / 2024

0
0 Love 54 Visits Published

From military barracks to an abandoned part of the town of Tempio Pausania in northern Sardinia to an inclusive PARK FOR ALL.


The park, designed according to universal design principles for genuine social inclusion and accessibility, officially opened on April 20.


The finished project is the result of a very positive collaboration and participation  process between the design team and the client, the Association of Municipalities of Alta Gallura, and the local population through a service design workshop that kicked off and helped guide the design work.


The park unites urban space around the church, play spaces and sports facilities that respond to different needs of people of all ages with various abilities and disabilities be they physical, sensory or cognitive.


The church was given a dignified exterior space within the park. The running track was transformed into a skate park. The existing sports fields were renovated for contemporary use. The remaining open space was designed for inclusive leisure, child's play and events. A refreshment stand and locker rooms are located at the center in the structure with the oval roof.


Project team:


VPS Architetti – lead designer.


Landscape architecture - Dong Sub Bertin DSB Lab.


Architecture - Luigi Depperu, Simone Ferreli.


Engineering - Alessandro Pintus.


Geology – Luigino Gianelo Pala.


Consultants – Narrazioni Urbane

0 users love this project
Comments
    comment
    user
    Enlarge image

    From military barracks to an abandoned part of the town of Tempio Pausania in northern Sardinia to an inclusive PARK FOR ALL. The park, designed according to universal design principles for genuine social inclusion and accessibility, officially opened on April 20. The finished project is the result of a very positive collaboration and participation  process between the design team and the client, the Association of Municipalities of Alta Gallura, and the local population through a...

    Project details
    • Year 2024
    • Work started in 2021
    • Work finished in 2024
    • Client Unione dei Comunei dell'Alta Gallura
    • Contractor Ledda Costruzioni
    • Cost 2 500 000
    • Status Completed works
    • Type Parks, Public Gardens / Sports Facilities / Leisure Centres
    Archilovers On Instagram