Westmark School | nbbj

United States / 2023

6
6 Love 288 Visits Published

Gathered around a grand California Sycamore tree and designed to be net zero, the project aligns the architectural vision to the highly specialized education and individualized instructional model of Westmark School. This includes physical accommodations for right-sized classrooms and learning environments that provide flexibility, healthy daylight and air quality, as well as movement, proper sound attenuation and shaded open space with opportunities for outdoor learning.


 


Architect: NBBJ


Contractor: Suffolk Construction


Engineer (Civil): KPFF


Engineer (MEP): tk1sc


Engineer (Structural): Fast + Epp


Landscape: SWA – Los Angeles Studio


Environmental Graphics: NBBJ


Lighting: NBBJ


Sustainability / Energy Analysis: Atelier Ten


Acoustical: Antonio Acoustics


 


Photography: Ty Cole

6 users love this project
Comments
    comment
    user
    Enlarge image

    Gathered around a grand California Sycamore tree and designed to be net zero, the project aligns the architectural vision to the highly specialized education and individualized instructional model of Westmark School. This includes physical accommodations for right-sized classrooms and learning environments that provide flexibility, healthy daylight and air quality, as well as movement, proper sound attenuation and shaded open space with opportunities for outdoor learning.   Architect:...

    Project details
    • Year 2023
    • Work finished in 2023
    • Client Westmark School
    • Status Completed works
    • Type Schools/Institutes / Interior Design
    • Websitehttps://www.nbbj.com/
    Archilovers On Instagram
    Lovers 6 users