Lot D3 of the Athletes’ Village for the Paris 2024 Olympic and Paralympic Games | ECDM Architectes
Reversible building France / 2024
Olympus /
The Malaparte house obsesses us, the unsurpassable absolute of a construction which makes the sky a home, relegating the constructed to the trivial, the common, the everyday.
Here, in the village, the building is seen as a topography, a mass belonging to the ground, telluric, mineral, an outgrowth of the ZAC plan to propose a sky, to reformulate a horizon. It is a question of constituting a geography by restricting oneself to the tenuous. We propose a docile mountain, modeled by the 28 meters at the last accessible floor. A shoddy Olympus under control but which draws a linear path between earth and sky while not forgetting to serve each of its levels. The facades are therefore accessible : no need to enter the building to be in the place with the minimal promise of a sky or a celestial vault as a cover for the gods of the stadium and their legatees.
emmanuel combarel dominique marrec
Olympus / The Malaparte house obsesses us, the unsurpassable absolute of a construction which makes the sky a home, relegating the constructed to the trivial, the common, the everyday. Here, in the village, the building is seen as a topography, a mass belonging to the ground, telluric, mineral, an outgrowth of the ZAC plan to propose a sky, to reformulate a horizon. It is a question of constituting a geography by restricting oneself to the tenuous. We propose a docile mountain, modeled...
- Year 2024
- Work started in 2022
- Work finished in 2024
- Status Completed works
- Type Office Buildings
comment