Construction going by step of a modern house in the beach | Michael Schildwachter

Michael Schildwachter explain us how to build a house in the beach Vancouver / Canada / 2020

0
0 Love 102 Visits Published

Michael Schildwachter Construction going by step of a modern house on the beach
The development of the construction of a house is fascinating for people who see that execution from a distance and see how it takes shape day by day. As the process takes time, it cannot always be fully witnessed, but today at homify we are going to show you the process of building a house located near the beach.


The images of some of the steps of this process are provided to us by the architects who authored the project and the management of the work, whose construction was awarded to a reputable local builder. We are going to see this step by step of the construction of a house next to a beautiful beach!


Michael Schildwachter Vancouver Canada Structure and enclosures of the ground floor
Once the foundation works are carried out, which include the excavation, reinforcement and concreting of the foundation footings, the perimeter plinth wall is built on which the floor slab of the ground floor and the pillars will be supported. of the structure in which it will support the forging of the roof of the ground floor. In the crowning of the pillars of the ground floor, visible reinforcements are left to continue the pillars of the upper floor. Some exterior enclosures are also being executed.


Structure and enclosures of the upper floor
When the ground floor ceiling slab has set, the upper floor pillars are built to support the upper floor ceiling slab, which is the roof of the house, on them.


 


Michael Schildwachter  Once these steps are finished, we proceed to make the coarse finishes such as the exterior enclosures, to finish with the fine finishes, the installation of the sanitary devices and the testing of the facilities such as the drinking water tank and the hydropneumatic equipment that makes the installation work correctly.


final works
Once the slab and the perimeter retaining walls are concreted, they are left to set with a wooden formwork, so that the structure obtains the necessary rigidity and can begin to receive the thick and thin finishes and the coatings that will make this structure take the shape of swimming pool. Naturally you have to check the tightness of the pool and test the equipment to ensure its correct start-up.

0 users love this project
Comments
    comment
    user
    Enlarge image
    Project Authors
    • Michael Schildwachter

      Michael Schildwachter

      Principal Architect

    Michael Schildwachter Construction going by step of a modern house on the beachThe development of the construction of a house is fascinating for people who see that execution from a distance and see how it takes shape day by day. As the process takes time, it cannot always be fully witnessed, but today at homify we are going to show you the process of building a house located near the beach. The images of some of the steps of this process are provided to us by the architects who authored the...

    Project details
    • Year 2020
    • Work started in 2019
    • Work finished in 2020
    • Status Completed works
    • Type Neighbourhoods/settlements/residential parcelling / Wellness Facilities/Spas / Beach Facilities
    Archilovers On Instagram