TVG – New Technical Administration Building | AllesWirdGut Architektur ZT GmbH

In the City, For the City Düsseldorf / Germany / 2029

0
0 Love 141 Visits Published

The design of the new Technical Administration Building of the municipality of Düsseldorf by
AllesWirdGut together with Hertl.Architekten rests on the foundation of a permeable plinth
and articulates the large built volume required in the competition brief as a slender tower of
four interlocked tall blocks.


The green plinth is understood as a continuum of directional-space between Moskauer
Strasse und IHZ Park whose open design establishes an intuitive connection between the two grade-line levels.


A cleft in this building part—kept deliberately low in relation to the
surrounding houses—marks the park-side main entrance. Intensive planting on the facades
and the plinth-area rooftops invites passing through, and lingering in, the little urban oasis.
Situated above the plinth is a conference center, the technical departments, and a
traffic-guidance and tunnel-control center (with separate access). Offering catering and
recreational facilities, the floors above that—accommodating a cafeteria with a large terrace
and a work-life balance level—connect the public zones with the office floors. These are each structured into two flexibly usable office units revolving around three-story winter gardens and meeting rooms.


The building’s climate and energy concept provides for utilizing local potentials from
renewable sources through photovoltaic systems, rainwater harvesting, concrete-core
activation, geothermal energy as well as supplementary local heating and cooling. Also in line with the desired positive eco-balance of the building is the timber-concrete composite
construction of all floors of the tower. With a high degree of prefabrication and short transport routes, the hybrid construction of the ceilings also makes for a resource-efficient solution. The individually developed zigzagged facade with photovoltaic and decentralized ventilation elements combines passive shading in summer with solar energy-production in winter. The greening concept for the Technical Administration Building provides for climateresilient and wind-resistant tree species as intensely colorful grasses and densely growing climbing plants, interweaving the building with its surroundings, from the courtyard to the roof terrace. All through the ground-floor zone, open-air space unfolds from Moskauer Strasse to the park, opening into a generous public square with amenity areas, trick fountains, and loosely planted groups of trees.

0 users love this project
Comments
    comment
    user
    Enlarge image

    The design of the new Technical Administration Building of the municipality of Düsseldorf byAllesWirdGut together with Hertl.Architekten rests on the foundation of a permeable plinthand articulates the large built volume required in the competition brief as a slender tower offour interlocked tall blocks. The green plinth is understood as a continuum of directional-space between MoskauerStrasse und IHZ Park whose open design establishes an intuitive connection between the two grade-line...

    Project details
    • Year 2029
    • Work finished in 2029
    • Client IPM Immobilien Projekt Management Düsseldorf GmbH
    • Status Competition works
    • Type Office Buildings
    Archilovers On Instagram