Nigeria National Theater | Desmus Cultural Architecture

Interior and Architectural Design, Application Projects , Acoustic Design, Avl Systems Design , Stage Engineering Systems Design Lagos / Nigeria / 2021

0
0 Love 92 Visits Published

The National Theatre, the most important cultural and artistic center of Nigeria, whose construction was completed in 1976, is being renovated after 45 years. Desmus' architectural design team takes part in the project.


The Nigerian National Theater, where Desmus has been involved in all including concept and interior design, noise control and sound insulation, room acoustics, professional systems, and stage mechanics projects, has a total area of 8.000 m2. It is expected to host many events with its 5,000-seat capacity.

0 users love this project
Comments
    comment
    user
    Enlarge image

    The National Theatre, the most important cultural and artistic center of Nigeria, whose construction was completed in 1976, is being renovated after 45 years. Desmus' architectural design team takes part in the project. The Nigerian National Theater, where Desmus has been involved in all including concept and interior design, noise control and sound insulation, room acoustics, professional systems, and stage mechanics projects, has a total area of 8.000 m2. It is expected to host many events...

    Project details
    • Year 2021
    • Status Current works
    • Type Multi-purpose Cultural Centres / Theatres / Building Recovery and Renewal
    Archilovers On Instagram