Red Sea Airport, Saudi Arabia | Simone Piacenti
Main Terminal Building, Ancillary Buildings, and ATC Building Saudi Arabia / 2022
The airport is scheduled to open in 2023 and designed to carry 1 million passengers by the year 2030, and is only one part of the overall Red Sea Development which is a luxury resort on the West Coast of KSA, built to provide luxury accommodation for tourists to a previously undeveloped region.
Role: Led design for the overall Terminal Envelope Roof / Facade from concept to
tender and construction stages, reports, client presentations and team coordination.
The airport is scheduled to open in 2023 and designed to carry 1 million passengers by the year 2030, and is only one part of the overall Red Sea Development which is a luxury resort on the West Coast of KSA, built to provide luxury accommodation for tourists to a previously undeveloped region. Role: Led design for the overall Terminal Envelope Roof / Facade from concept to tender and construction stages, reports, client presentations and team coordination.
- Year 2022
- Work started in 2021
- Status Current works
- Type Airports
comment