NO. 1 COURT WIMBLEDON | KSS

London / 2019

4
4 Love 599 Visits Published

BEMO has worked closely with its supply chain partner Prater to engineer and supply over 7,000m² of the N65 profile to the new roof on Court 1 at Wimbledon. The close working relationship between BEMO and Prater was vital to ensure that both design teams could coordinate to overcome the complexities of such a challenging project. BEMO’s engineering team designed the TP35 deck profile and tapered standing seam panels in 2-layer PVDF RAL6007 coated aluminium. The complicated shape of the roof took advantage of BEMO’s unique mass-customised BEMO-Flex sub-structure, which involved 3D surveys of the as built-structure to eliminate structural tolerances, ensuring that the external surface followed the design intent.

4 users love this project
Comments
    comment
    user
    Enlarge image

    BEMO has worked closely with its supply chain partner Prater to engineer and supply over 7,000m² of the N65 profile to the new roof on Court 1 at Wimbledon. The close working relationship between BEMO and Prater was vital to ensure that both design teams could coordinate to overcome the complexities of such a challenging project. BEMO’s engineering team designed the TP35 deck profile and tapered standing seam panels in 2-layer PVDF RAL6007 coated aluminium. The complicated shape of...

    Project details
    • Year 2019
    • Work finished in 2019
    • Status Completed works
    • Type Sports Centres / Stadiums / Sport halls / Sports Facilities
    Archilovers On Instagram
    Lovers 4 users