René Beauverie School Group | Dominique Coulon & associés

Vaulx-en-Velin Vaulx-en-Velin / France / 2020

22
22 Love 4,206 Visits Published

As part of an urban renewal scheme, the town of Vaulx-en-Velin decided to combine with this large school group a number of programmes offering neighbourhood services, including a creche, a dance hall, a sports hall, a small library, and a restaurant. 


The building has a very unitary appearance, with the classrooms spread over a length of 40 metres as if on a bridge. It clearly asserts its status as a public facility.


The various entrances focus on a common forecourt, from which the programmes spread out in a complex yet fluid imbrication. 


The ground floor is given over to the creche, the sports hall, and the nursery school. To reach the primary school, the pupils must use the large staircase leading to a courtyard area on the upper storey.


The building has the appearance of a hollowed-out block. The various courtyards and patios bring natural light into the heart of the building, adding a gentle touch to the interior.


The presence of different shades of blue provides links that are at times unexpected. The areas of white on modified by the various shades of blue; variations are caused by the light and the changing angle of the sun. The colour modifies the white areas, which eventually appear to take on colour themselves. These variations in colour and light change throughout the day, depending on the changing angle of the sun, and as a result the white areas are never completely white; the multiple reflections give the areas a feeling of architecture in movement.


The colour is an obvious choice: the building is in dialogue with the horizon and the blue of the sky. The many programmes complement each other harmoniously, fitting together calmly despite their complexity.


 


Project management :Dominique Coulon & associés
Architects : Dominique Coulon, Steve Letho Duclos, Jean Scherer,
Assistant architects : Sarah Brebbia, Javier Gigosos, Lukas Unbekandt, Yannick Signani, Ali Ozku, Benjamin Rocchi, Margot Machin, Diego Bastos-Romero
Intern architect : Santiago Cañete


Structural engineering : Batiserf Ingénierie
Mechanical engineering : Solares Bauen
Electrical engineering : BET G.JOST
Cost control and monitoring : E3 économie
Landscape : Bruno Kubler
Acoustician : Euro Sound Project
Kitchen specialist : ÉS Services
Ergonomist : Defacto


Program : nursery, infant school & elementary school, sport complex, library & canteen, multipurpose room, janitor’s housing


Address : Chemin Gaston Bachelard, 69120 Vaulx-en-Velin, France
GPS coordinates : 45.777008, 4.915239


Surface : 6 168 sqm
Budget : 12 511 000 €


Schedule 
Competition : april 2015
Studies : July 2015 to November 2016
Partial delivery : September 2019


Construction companies : Earthwork, road works (STAL TP), landscape (MANIEBAT SAS), water and misc. networks (STAL TP), structural works, metal frame (EIFFAGE GS – LYON GÉNIE CIVIL, ERTCM), water proofing (APC ÉTANCH’ GRAND LYON), exterior aluminium joinery, solar shading (BLANCHET) external thermic insulation, scaffolding (MONTÉLIMAR FAÇADES, JPE ECHAFAUDAGE, metal works, fencing (BLANCHET), Wood joinery, Furniture (GUILLON), plastering insulation, drop ceiling (SAS NEBIHU), glued floors, sport floor (COURBIERE & FILS), floor and wall tiles (CMM), painting, cleaning (RAVALTEX), elevator (COPAS), electrical high and low voltage (SNEF), plumbing, heating, ventilation (HERVÉ THERMIQUE), kitchen appliances (CUNY PROFESSUINNEL), photovoltaic panels (SOLSTYCE)
Photographs : Eugeni Pons, David Romero-Uzeda

22 users love this project
Comments
    comment
    user
    Enlarge image

    As part of an urban renewal scheme, the town of Vaulx-en-Velin decided to combine with this large school group a number of programmes offering neighbourhood services, including a creche, a dance hall, a sports hall, a small library, and a restaurant.  The building has a very unitary appearance, with the classrooms spread over a length of 40 metres as if on a bridge. It clearly asserts its status as a public facility. The various entrances focus on a common forecourt, from which the...

    Project details
    • Year 2020
    • Work finished in 2020
    • Client City of Vaulx-en-Velin
    • Status Completed works
    • Type Schools/Institutes
    Archilovers On Instagram
    Lovers 22 users