Kelar Abad Villa | BeraNia Office
Logical Attractive Chālūs / Iran / 2020
MAIN INFO
Project Name : Kelar Abad Villa
Architecture Firm : BeraNia Office
Architect in charge : Mohammad Reza Niazy, Mohammad Javad Niazy
Design Team : Shaghayegh Namazkar, Amin Samani, Farnoosh Shojaei, Nariman Rafati
Office Website : www.beraniaoffice.com
Contact Email : [email protected]
Completion Year : 2020
Built Area (m2 or sqft) : 1500 m2
Project Location : Iran, Mazandaran, Kelar Abad
Client : Mehrdad Keshmirpour
Construction : BeraNia Builds
Structure : Dr.Davoud Zare’ei
MEP : Future, Energy, Architecture CO
PROJECT DESCRIPTION
In the past in moderate and humid climate one of the most important strategies to design the buildings was extravagant organizing and wide opening around to maximum use of air ventilation.
According to location of the building between the forest view and the sea view, the project organizing along the north-south axes to provide maximum ventilation through the wind direction.
Also in traditional architecture of Iran there was an exterior circulation from land to roof called “Qolamgard”.
This project concept is about continuity of circulation from landscape to roof garden connected all of the exterior terraces. We tried to redefining the issue in contemporary solution that lacating the project in global scope while it is searching for connection with Iranian geography and history.
The slope of the roof is not just a solution for adapting to climate. It’s a part of the project's program that offers a new experience to the user to enjoy from watching the beautiful view of sea and forest.
MAIN INFO Project Name : Kelar Abad Villa Architecture Firm : BeraNia Office Architect in charge : Mohammad Reza Niazy, Mohammad Javad Niazy Design Team : Shaghayegh Namazkar, Amin Samani, Farnoosh Shojaei, Nariman Rafati Office Website : www.beraniaoffice.com Contact Email : [email protected] Completion Year : 2020 Built Area (m2 or sqft) : 1500 m2 Project Location : Iran, Mazandaran, Kelar Abad Client : Mehrdad Keshmirpour Construction : BeraNia...
- Year 2020
- Work started in 2019
- Work finished in 2020
- Main structure Steel
- Client Mr.Keshmiri
- Contractor BeraNia Office
- Status Current works
- Type Single-family residence
comment