The Daniels Building at the University of Toronto embodies a holistic approach to urban design and sustainability. As the new home for the John H. Daniels Faculty of architecture, landscape, and design, its purpose is to engage students and the broader community in dialogue about the built environment.


At the center of one of Toronto’s few circular parcels, the project anchors the southwest corner of the University and opens the circle to the public after years of inaccessibility. It restores the historic and forgotten building to its original grandeur while also integrating a new addition. The north-south axis characterizes symbolic relationships to the City, while the east-west axis is activated by pedestrian traffic. On the western edge, a discreet arcade addresses the residential scale of the adjacent neighborhood. Meanwhile, a public plaza to the east creates a prominent relationship with the campus. The renewed site invites activity, with circulation for pedestrians and cyclists. Extensive sustainable features including a noteworthy approach to site stormwater management while simultaneously bringing a heritage building back to life.


The design of this building presented a case where problems of pedagogy come face to face with a physical environment that is inhabited and tested daily by an audience of experts, critics, teachers, practitioners, and students, the very protagonists of the medium. It is perhaps one of the few occasions where the audience is engaging with the building and its authors at a higher level, making it an added challenge –and responsibility– to speak to architectural questions with a greater degree of nuance, as such the building was designed to become a pedagogical tool, integrated into the curriculum with both sustainable/design elements and school programs on display both to students and the public.


---


Lead Architects:
Lead Architect: NADAAA
Principals: Katherine Faulkner, AIA; Nader Tehrani
Project Managers: Richard Lee, Tom Beresford, RA
Project Team: John Houser, Amin Tadj, Tim Wong, Alda Black, Marta Guerra, James Juricevich, Parke Macdowell, Dane Asmussen, Laura Williams, Peter Sprowls, Noora Al Musallam, Tammy Teng, Wesley Hiatt, John Mars, Mazyar Kahali, Matthew Waxman, Luisel Zayas


Associated Architect / Architect of Record: Adamson Associates Architects
Principal: Claudina Sula, OAA
Project Team: Jack Cusimano, Tina Leong, John McMillan, Martin Dolan, Zbigniew Jurkiewicz, Michael Lukachko, Zale Spodek, Gilles Leger, George Georges, Ke Leng Tran


Consultants:
Heritage Consultant: ERA Architects
Structural: Entuitive Corporation
Building Envelope consultant: Entuitive Corporation
Electrical / Data / AV / Lighting design: Mulvey Banani International, Inc.
Mechanical / Plumbing: The Mitchell Partnership
Acoustics: Aercoustics Engineering Ltd
Civil: A. M. Candaras Associates, Inc.
Landscape: Public Work
Hardware: Upper Canada Specialty Hardware, Ltd.
Construction Manager: Eastern Construction Company Ltd
Select furniture design and construction: Daniels Faculty



Brands / Products


Exterior Wall System, ultra high performance concrete: TAKTL
https://www.taktl-llc.com/what-is-taktl/


Hollow Deck System: Bubbledeck
https://www.bbdna.com/


Curtainwall System: Alumicor
https://www.alumicor.com/en/products/


Radiant System: Rehau
https://www.rehau.com/us-en/mechanical-and-plumbing/radiant-heating-and-cooling


Ceiling framing system: Armstrong

23 users love this project
Comments
    comment
    user
    Enlarge image

    The Daniels Building at the University of Toronto embodies a holistic approach to urban design and sustainability. As the new home for the John H. Daniels Faculty of architecture, landscape, and design, its purpose is to engage students and the broader community in dialogue about the built environment. At the center of one of Toronto’s few circular parcels, the project anchors the southwest corner of the University and opens the circle to the public after years of inaccessibility. It...

    Project details
    • Year 2018
    • Work finished in 2018
    • Status Completed works
    • Type Colleges & Universities / Research Centres/Labs
    Archilovers On Instagram