Carey Baptist Grammar School, Middle School Redevelopment | Alison Calderone

Kew / 2020

1
1 Love 713 Visits Published

Carey Baptist Grammar School is a leading Christian co-educational independent school, committed to student-centred learning and well-being. It is an open-entry school with a philosophy of education that is based around a broad and challenging curriculum. The redevelopment of Carey’s Middle School building is a critical component of the school’s strategic plan to accommodate strong growth in student numbers.
In collaboration with school leaders, students and teachers, Architectus developed an Education Design Brief that responds to the specific needs of Carey’s Middle School students and their teachers. It describes six interconnected learning precincts, each of which is a physical expression of the subject it hosts and the learning experiences and resources students and teachers can expect to find there. Each learning precinct is composed from a wide variety of purposeful learning settings and clearly articulated circulation paths.
The Middle School scheme is premised on three key design elements: the formal determination of the building by its context; a fully developed education plan, and the creation of an architectural framework to support the education plan.
The south and west elevations comprise a series of boxes alternately slipped in and out within a fabricated steel frame that outwardly express the diagram of the internal plan. The proportions and modularity of these primary forms are a direct manifestation of the internal spatial requirements of the Education Design Brief, and a response to the fine physical grain of the building’s suburban context.

1 users love this project
Comments
    comment
    user
    Enlarge image

    Carey Baptist Grammar School is a leading Christian co-educational independent school, committed to student-centred learning and well-being. It is an open-entry school with a philosophy of education that is based around a broad and challenging curriculum. The redevelopment of Carey’s Middle School building is a critical component of the school’s strategic plan to accommodate strong growth in student numbers. In collaboration with school leaders, students and teachers,...

    Project details
    • Year 2020
    • Work started in 2016
    • Work finished in 2020
    • Client Carey Baptist Grammar School
    • Status Current works
    • Type Schools/Institutes
    Archilovers On Instagram
    Lovers 1 users