"Jaworznickie Planty" with water playground | RS+ Robert Skitek

Jaworzno / Poland / 2018

4
4 Love 2,650 Visits Published


The project included designing of water playground with public greeneries land at the former coal mine terrains. The plan sets up a group of rounded plazas merging with greenery and connected with streams flowing down to the central part. The water playground is situated in the focal point, surrended by green hills. It is recessed regard to the sorrounding alleys level. It makes a comfortable situation for little users, not being visible to walkers from the main alley. Playground is a entwined with shallow stream, acting as footbath pool. Floors pattern refers to sprilling water and makes a background for colorful water toys. Around the water playground there are benches and seats for parents. That helps them taking care for their playing children. A technical building with toilets is hidden inside one of the green hills alongside the main alley. Unusual shapes of curved benches create a green and quiet places, perfect for a resting, meeting with friends and looking at the sky laying on the hanging nets. Carefully designed greenery, rustling grass, colorful bushes and flower meadow complete the whole project. The plan assumed keeping a previous trees localization in the south part. Now, these trees make a balmy, cold shadow in the sizzling hot days. Rounded plazas, due of its form, make a comfortable and cosy exteriors, coax walkers to integrate, by its harmonious and consistent plan.


Architects: RS+ Robert Skitek http://rsplus.pl/
Investor: Jaworzno Municipality
Location: Jaworzno
Area: 6900m2
Building area: 114m2
Design: 2015
Copleted: 2018


Author: arch. Robert Skitek,
Cooperation: arch. Jakub Zygmunt, arch. Jarosław Zieliński, arch. Martyna Lenart-Zygmunt, stud. arch. Wojciech Zientek
Structure: Lechprojekt, Marta Weszke, Leszek Weszke, Piotr Weszke
Water tech.: RBB Baseny, Anna Terentjew
Planting plan: Ekosystem-Pracowania Architektury Krajobrazu, Łukasz Bielawski


Photographs: Tomasz Zakrzewski http://archifolio.pl/

4 users love this project
Comments
    comment
    user
    Enlarge image

    The project included designing of water playground with public greeneries land at the former coal mine terrains. The plan sets up a group of rounded plazas merging with greenery and connected with streams flowing down to the central part. The water playground is situated in the focal point, surrended by green hills. It is recessed regard to the sorrounding alleys level. It makes a comfortable situation for little users, not being visible to walkers from the main alley. Playground is a entwined...

    Project details
    • Year 2018
    • Work started in 2017
    • Work finished in 2018
    • Client Jaworzno Municipality
    • Status Completed works
    • Type Parks, Public Gardens / Urban Furniture
    Archilovers On Instagram
    Lovers 4 users