Hotel in Coimbra | DEPA

Coimbra / Portugal / 2017

51
51 Love 5,065 Visits Published

The three pre-existing buildings around a mediterranean courtyard are located Coimbra, in the city’s UNESCO World Heritage Protection Zone.


In such delicate surroundings, the intervention seeks a delicate design balanced between the need for technical adaptations to contemporary building demands, the legal requirements for a contemporary hotel and the huge care that an intervention of this type requires. In other words, the adaption to the new program and the consequent deep intervention by all means paid deep respect for the historical relevance of the buildings and its great architectural and constructive values.


This balanced strategy allowed, at the same time, to clarify the difference between the preserved old elements and all the new and, above all, the difference between the three buildings: the former house on the upper level, the small palace on the lower level, and the third in-between, which is more picturesque.


The courtyard which aggregates the three buildings is open to the public and is the life heart of the new hotel.


The use of traditional materials such as stone, wood and iron, not only for for structural purposes but also for final details and finishings made, at the end, the whole intervention coherent and avoids a disruptive atmosphere or design.



Data:
Architecture: depA Architects (Carlos Azevedo, João Crisóstomo, Luís Sobral, Miguel Santos, Sara Pontes, Margarida Leitão)
Engeneering: CPX, Ncrep, Mse
Consultants: Financertus
Design: 2014-2015
Construction: 2016-2017
Photo Credits: José Campos

51 users love this project
Comments
    comment
    user
    Enlarge image

    The three pre-existing buildings around a mediterranean courtyard are located Coimbra, in the city’s UNESCO World Heritage Protection Zone. In such delicate surroundings, the intervention seeks a delicate design balanced between the need for technical adaptations to contemporary building demands, the legal requirements for a contemporary hotel and the huge care that an intervention of this type requires. In other words, the adaption to the new program and the consequent deep intervention...

    Project details
    • Year 2017
    • Work started in 2014
    • Work finished in 2017
    • Status Completed works
    • Type Hotel/Resorts
    Archilovers On Instagram
    Lovers 51 users