Construction of a 1000 m3 HFO TANK

Electrical and Automation of a 1000 m3 HFO Tank Douala / Cameroon / 2016

0
0 Love 418 Visits Published

ELECTRICAL AND AUTOMATISM OPERATIONS OF THE H.F.O 1000 m2 STORAGE TANK
OF LOGBABA THERMAL POWER PLANT.


- Decommissionning of existing equipments
• Power and control cables LV
• Network of existing land.
• Existing instrument (heater, level sensor (3), BJ)
• Thermometer 0-120 ° C
- Installation of the renewed equipments
 Installation of (Junction box, thermometer)
 Installation of three level switches A01041 TRIMOD BESTA
 Installation of an immersion heater DN300 PN 16 FS Type 2006.
 Cable landing.
 Connection
 Groundings.
-Precommissionning
 Application of tests on cables and equipment
 Continuity test
 Insolation test
 Test report
-Commissionning
 synchronization Test
 Commissionning

0 users love this project
Comments
    comment
    user
    Enlarge image

    ELECTRICAL AND AUTOMATISM OPERATIONS OF THE H.F.O 1000 m2 STORAGE TANKOF LOGBABA THERMAL POWER PLANT. - Decommissionning of existing equipments• Power and control cables LV• Network of existing land.• Existing instrument (heater, level sensor (3), BJ)• Thermometer 0-120 ° C- Installation of the renewed equipments Installation of (Junction box, thermometer) Installation of three level switches A01041 TRIMOD BESTA Installation of an immersion heater DN300 PN 16 FS Type...

    Project details
    • Year 2016
    • Work started in 2015
    • Work finished in 2016
    • Main structure Steel
    • Client FRIEDLANDERELECTRICAL AND AUTOMATISM OPERATIONS OF THE H.F.O 1000 m2 STORAGE TANK OF LOGBABA THERMAL POWER PLANT
    • Contractor ABN AUTOMATION
    • Cost 17 000 000
    • Status Completed works