Construction of a 1000 m3 HFO TANK | ARCHITECTURAL AND ENGINEERING DESIGN LAB
Electrical and Automation of a 1000 m3 HFO Tank Douala / Cameroon / 2016
ELECTRICAL AND AUTOMATISM OPERATIONS OF THE H.F.O 1000 m2 STORAGE TANK
OF LOGBABA THERMAL POWER PLANT.
- Decommissionning of existing equipments
• Power and control cables LV
• Network of existing land.
• Existing instrument (heater, level sensor (3), BJ)
• Thermometer 0-120 ° C
- Installation of the renewed equipments
Installation of (Junction box, thermometer)
Installation of three level switches A01041 TRIMOD BESTA
Installation of an immersion heater DN300 PN 16 FS Type 2006.
Cable landing.
Connection
Groundings.
-Precommissionning
Application of tests on cables and equipment
Continuity test
Insolation test
Test report
-Commissionning
synchronization Test
Commissionning
ELECTRICAL AND AUTOMATISM OPERATIONS OF THE H.F.O 1000 m2 STORAGE TANKOF LOGBABA THERMAL POWER PLANT. - Decommissionning of existing equipments• Power and control cables LV• Network of existing land.• Existing instrument (heater, level sensor (3), BJ)• Thermometer 0-120 ° C- Installation of the renewed equipments Installation of (Junction box, thermometer) Installation of three level switches A01041 TRIMOD BESTA Installation of an immersion heater DN300 PN 16 FS Type...
- Year 2016
- Work started in 2015
- Work finished in 2016
- Main structure Steel
- Client FRIEDLANDERELECTRICAL AND AUTOMATISM OPERATIONS OF THE H.F.O 1000 m2 STORAGE TANK OF LOGBABA THERMAL POWER PLANT
- Contractor ABN AUTOMATION
- Cost 17 000 000
- Status Completed works
- Type Factories