SEDATEX OFFICES | Picharchitects/Pich-Aguilera

ADAPTATION AND REFORM OF AN INDUSTRIAL SPACE TO NEW USES Barcelona / Spain / 2018

8
8 Love 2,719 Visits Published

DRAFT. ADDRESS. Health and safety study. PICHARCHITECTS / PICH-AGUILERA


Authors: Felip Pich-Aguilera Baurier, architect. Teresa Batlle i Pagès, architect


Project manager: Margherita Aricó, architect.


Group Heads: Jordi Camps, Jordi Paris, Angel Sendarrubias.


 


SPECIALIST COLLABORATORS:


Roger Calonge, engineer. Engineering, support in the basic project


Nibex facilities. Engineering, support in the executive project and work.


Javier Chaves, G3, measurements and budgets


Javier Chaves, G3. Execution address


Lidia Manuseva, architect. Interior design


 


CONSTRUCTORA: Edelbau


 


PHOTOGRAPHER: Sol Quiñones


 


WORK VOLUME: 2,234.58 m2


PRICE WORK (P.E.M.): 1,000,000 euros

8 users love this project
Comments
    comment
    user
    Enlarge image

    DRAFT. ADDRESS. Health and safety study. PICHARCHITECTS / PICH-AGUILERA Authors: Felip Pich-Aguilera Baurier, architect. Teresa Batlle i Pagès, architect Project manager: Margherita Aricó, architect. Group Heads: Jordi Camps, Jordi Paris, Angel Sendarrubias.   SPECIALIST COLLABORATORS: Roger Calonge, engineer. Engineering, support in the basic project Nibex facilities. Engineering, support in the executive project and work. Javier Chaves, G3, measurements and...

    Project details
    Archilovers On Instagram
    Lovers 8 users