Mus Airport | GMW MIMARLIK

Muş / Turkey

1
1 Love 941 Visits Published

In response to the significant increase in international and domestic passenger traffic at Mus Airport in South East Turkey, DHMI (State Airports Authority of Turkey) appointed GMW MIMARLIK to design a new 11,400 sqm terminal building.


Processing of all arriving and departing passengers take place at ground level, which has been designed to achieve the optimum efficiency of circulation. Provision is made in the layout for the segregation of domestic and international passengers. There is also a narrow strip of mezzanine level accommodation for offices and technical areas.


The simple form of the terminal building is functional and responds to its specific environmental context. The predominantly metal clad external envelope seamlessly unifies the perimeter walls and the large expanse of roof surface. The fully glazed external walls, along both the landside and the airside, provide transparency and daylight to the generously proportioned building interior and have been articulated to reflect the different functions within. Especially mindful of the harsh winters with long periods of snow cover, the main drive for the roof design has been to avoid excessive build up of snow and thus to minimize maintenance.


 


Credits:


Design Office: GMW MIMARLIK


Project Team: Ali Evrenay Ozveren, Dicle Demircioglu, Pinar Ilki Emekci, Koray Ozveren, Okan Akben, Damla Turan, Cem Uzman


Location: Mus / Turkey


Contractor: State Airports Authority of Turkey (DHMI)


Project Area: 11.400 sqm   


Statics Project: Tuncel Engineering


Mechanical Project: Moskay Engineering


Electrical Project: HB Teknik Engineering


Landscape Design: Eylul Peyzaj


Infrastructure: Sigal Engineering

1 users love this project
Comments
    comment
    user
    Enlarge image

    In response to the significant increase in international and domestic passenger traffic at Mus Airport in South East Turkey, DHMI (State Airports Authority of Turkey) appointed GMW MIMARLIK to design a new 11,400 sqm terminal building. Processing of all arriving and departing passengers take place at ground level, which has been designed to achieve the optimum efficiency of circulation. Provision is made in the layout for the segregation of domestic and international passengers. There is also...

    Project details
    • Work started in 2017
    • Client State Airports Authority of Turkey (DHMI)
    • Status Current works
    • Type Airports