CHUM - Centre hospitalier de l’Université de Montréal

Montreal / Canada / 2017

25
25 Love 8,136 Visits Published

After nearly a decade of work, CannonDesign + NEUF architect(e)s are pleased to announce the completion of Phase 1 of the Centre hospitalier de l’Université de Montréal (CHUM).  Begun in 2009, the CHUM teaching institution is the largest healthcare construction project in North America and the largest healthcare public—private partnership project in Canadian history. Already, the building has ignited the revitalization of a neglected sector of Montreal’s urban core.  


“It’s remarkably rewarding to see so many years of preparation, planning, design and intense effort come to life,” said Jose Silva, Principal for CannonDesign. “The CHUM has always been an extraordinary project—from the bold vision that set it in motion nearly a decade ago to the beautiful building it has now become. This is an exciting moment for both those who worked on the project and those who will benefit from this state-of-the-art facility.” 


Accelerating public access


Initially structured as a two-phased project, the team reconfigured the indicative design of the campus arrangement and architecture in order to accelerate development significantly. As a result, Phase I, now complete, delivers the hospital’s core healthcare capabilities, including all patient rooms, all operating theatres, diagnostic and therapeutics, as well as the Oncology program, leaving only offices, a conference center, a few ambulatory spaces, and additional parking for Phase 2.  This allows the Quebec population to benefit from the much-needed state-of-the-art healthcare infrastructure years sooner than originally anticipated.


Human inspiration


With social infrastructure and urban renewal as integral components to its design, the 22-storey complex, spanning over 3 million square feet and encompassing two full city blocks, will play an important role in regenerating the neglected East-end of Montreal’s downtown core, reconnecting the city’s urban fabric and anchoring the Quartier de la Santé, Montreal’s new healthcare district. In addressing the totality of that task, the design team approached the project from all scales, including the large-scale urban element, the local neighbourhood context, and the fine grain of a human component, central to its vocation as a place of healing.


“Walking through the completed spaces today, we feel a spatial quality that is in line with the ambitions of this great institution,” explains Azad Chichmanian, partner and architect with NEUF architect(e)s. “As the public finally begins to discover the architectural moments that have been created, from the inviting, light-filled public spaces to the state-of-the-art clinical facilities, we believe the building will succeed in completely redefining Montrealers’ image of what a hospital feels like.”


Throughout the design process, the team continually pushed the envelope for quality of design, whether in its use of parametric design on the building envelope, the use of 3D-printed models in coordination, an innovative approach to the integration of heritage components, and an intense use of technology to facilitate communication between team members from across the globe.


From a healthcare delivery perspective, each of the 772 rooms includes ample space for family involvement, and expansive windows offering some of the best views of the city. Importantly, the entire building is designed following universal design principles, and impressively, the vast majority of the 12,000+ rooms in the building were designed following a small number of standardized room templates. “The creation of such an incredible healthcare facility required our design team to look at the project from numerous perspectives, but we leveraged our health expertise to always keep patient experience at the forefront.” added Silva.


Art at the heart of the architecture
Going well beyond the Quebec government’s requirement of dedicating a minimum of 1% of a public development’s budget to the integration of art, the new CHUM campus will have 13 large-scale works of art incorporated into the design and ultimately house the highest concentration of public art in Montreal since Expo 67.


“We have integrated the art directly into the architecture of the complex in ways that blur the lines between the two and provides a more human experience to the visitor and staff”, explains Chichmanian. “In fact, many components of the buildings themselves can be considered as works of art, including the amphitheater, the reconstructed steeple, Maison Garth and the Space of Contemplation—forming a series of architectural objects animating Saint-Denis Street.  Perhaps the best example is the passerelle, an aerial bridge now spanning across Sanguinet Street with its translucent arch emerging from the perforations of the copper shroud enveloping it.”


Technical sheet
Official name of the project: Centre Hospitalier de l'Université de Montréal —CHUM
Location: Montreal, Canada
Client: Construction Santé Montréal
Architects/designers: CannonDesign + NEUF architect(e)s
Principals in charge: Jose Silva, AIA and Azad Chichmanian, OAQ
Engineers: Pasquin St-Jean, HH Angus, Groupe SM
Landscape architects: NIP Paysage
Contractors: Construction Santé Montréal
Area of project: Approximately 3 million square feet
Budget:  2 billion CAD$
Image credits: Adrien Williams, CannonDesign + NEUF architect(e)s, and Karine Savard 


Number of storeys:
Main Building—22 above grade and 5 subgrade levels
Ambulatory Center—19 above grade and 4 subgrade
Medical Office Building/Library—16 above grade and 3 subgrade, Logistics/lab and pharmacy—10 above grade and 3 subgrade
Auditorium—3 above grade (Phase 2)
Parking—4 levels of subgrade parking which sits under the main plaza and is interconnected with the hospital, the ambulatory center; the medical office/library; and the auditorium/learning center. (Phase 2) 


Dates:
Completion of Phase 1: 2017
Completion of Phase 2: 2021

25 users love this project
Comments
    comment
    user
    Enlarge image

    After nearly a decade of work, CannonDesign + NEUF architect(e)s are pleased to announce the completion of Phase 1 of the Centre hospitalier de l’Université de Montréal (CHUM).  Begun in 2009, the CHUM teaching institution is the largest healthcare construction project in North America and the largest healthcare public—private partnership project in Canadian history. Already, the building has ignited the revitalization of a neglected sector of...

    Project details
    • Year 2017
    • Work finished in 2017
    • Client Construction Santé Montréal
    • Status Completed works
    • Type Colleges & Universities / Hospitals, private clinics
    • Websitehttp://www.chumontreal.qc.ca/
    Archilovers On Instagram
    Lovers 25 users