MODERN ART MUSEUM at BERLIN

Berlin Berlin / Germany / 2015

3
3 Love 1,639 Visits Published

The project plan is expressed in this way: the completion of the   city by placing an L form mass that provides both a place to the   secondary services of the museum which are the   library,auditorium, administrative offices and a continuation to   the spacial sequence which contains the system of monuments.


 


The museum is inserted as a topos at the intersection of this   overlaping system as a threshold and manages the urban spaces.


 


The primary form is defined by geometric transformations, using the external vectors by reading the elements present in the urban structure, and historical paths.We have introduced the theme of the trajectory along the river as a beginning of the museum, and the theme of light through the horizontal gaps between the volumes to illuminate the double height exhibition spaces.


 


The contrast between interior and exterior spaces is perceived by the observer inside the museum.


 


As observer continues through the trajectory inside the museum which is guaranteed by the vertical dark voit, arrives to these elevated urban spaces in light where the city becomes an exhibition itself.As the volume of the museum arrives to the height of the city, it undergoes into a geometric transformation through the rotation of horizontal axis, to a longitudinal axis which emphasizes the overlapping of time.


 


Two operas of Mies van der Rohe are esposed in the top of the building,one of them is ending the composition and the other one is located towards to Friedrichstrasse.


 


The opera in this room is placed artificially into the landscape, the work seems to be inserted where it would be designed.The trajectory leads to the terrace with a panaromic iew where the observers are able to understand how the  relationship between the Museuminsel, the Tiergarten and the  volume of museum as a threshold of the city is presented.

3 users love this project
Comments
    comment
    user
    Enlarge image

    The project plan is expressed in this way: the completion of the   city by placing an L form mass that provides both a place to the   secondary services of the museum which are the   library,auditorium, administrative offices and a continuation to   the spacial sequence which contains the system of monuments.   The museum is inserted as a topos at the intersection of this   overlaping system as a threshold and manages the urban spaces.   The primary form...

    Project details
    • Year 2015
    • Work started in 2014
    • Work finished in 2015
    • Status Completed works
    • Type Public Squares / Urban Furniture / Urban development plans / Landscape/territorial planning / Office Buildings / Offices/studios / Multi-purpose Cultural Centres / Theatres / Museums / Libraries / Archaeological Areas / Conference Centres / Pavilions / Exhibition Design / Shopping Malls / Showrooms/Shops / Interior Design / Exhibitions /Installations / Monuments / River and coastal redevelopment / Strategic Urban Plans / Metropolitan area planning / Book shops / Media Libraries
    Archilovers On Instagram
    Lovers 3 users