Red Bridge

90 meter long metal platform entirely consists of bolted joints. Baku / Azerbaijan / 2013

4
4 Love 1,788 Visits Published

Situated at Heydar Aliyev public park of Binagadi, Baku city, 


Red Bridge is 90 meter long metal platform with 5 balconies. The entire structure consists of bolted joints. The whole platform is powder coated and made by applying special drawing, welding & cutting. Red Bridge is a great construction for Public Areas. 


 

4 users love this project
Comments
    comment
    user
    Enlarge image

    Situated at Heydar Aliyev public park of Binagadi, Baku city,  Red Bridge is 90 meter long metal platform with 5 balconies. The entire structure consists of bolted joints. The whole platform is powder coated and made by applying special drawing, welding & cutting. Red Bridge is a great construction for Public Areas.   

    Project details
    • Year 2013
    • Work started in 2013
    • Work finished in 2013
    • Main structure Steel
    • Status Completed works
    • Type Parks, Public Gardens / Public Squares / multi-purpose civic centres / Bridges and Roads / Urban development plans / Landscape/territorial planning / Tourist Facilities / Bridges and Walkways / Metropolitan area planning / Product design
    Archilovers On Instagram
    Lovers 4 users