Biotechnology Center | Luciano Pia

Self-compacting concrete, tempered glass and metal. Turin / Italy / 2006

0
0 Love 1,388 Visits Published

The building contains and organizes, separating them spatially and visually, the spaces for teaching and support staff, research laboratories and a business incubator with premises related services and administration, all connected by a porch and routes protected.


The classrooms are all located in the new construction, in a position close to the main entrance and introduced the first courtyard, separated from the street by a large window wall, home to tall trees and has a filter and distribution.


The second courtyard, inside and whose top closure allows the creation and maintenance of a winter garden, it is bordered by the laboratories instead, on two levels, and organized a drive that each comprise a laboratory three workrooms, and the premises of 'incubator, all open to an interior where glass and metal catwalks and ramps allow connections.


Design by Luciano Pia

0 users love this project
Comments
    comment
    user
    Enlarge image

    The building contains and organizes, separating them spatially and visually, the spaces for teaching and support staff, research laboratories and a business incubator with premises related services and administration, all connected by a porch and routes protected. The classrooms are all located in the new construction, in a position close to the main entrance and introduced the first courtyard, separated from the street by a large window wall, home to tall trees and has a filter and...

    Project details
    • Year 2006
    • Work started in 2003
    • Work finished in 2006
    • Main structure Reinforced concrete
    • Client Università degli Studi di Torino
    • Contractor DE-GA
    • Cost 15.000.000 Euro
    • Status Completed works
    • Type Research Centres/Labs
    Archilovers On Instagram