Hotel Gardenazza | SIRS

Long-listed for ArchDaily’s Building of the Year 2020 Award Badia / Italy / 2015

24
24 Love 3,497 Visits Published

The existing building structure, nestled in the heart of the Italian Dolomites, consisted of two parts, the original front dating back to 1939 and a more recent rear extension from the 1990ies. The project scope consisted in replacing the aged 30ies structure with a new 5-storey low-energy building to provide contemporary hotel facilities with a 33 bed capacity as well as meeting current fire and building regulations, which the existing structure was not able to achieve.


Basement and ground floor structures were built in reinforced concrete, whilst the upper 3 levels were assembled with cross-laminated Glue-lam panels. The prefabricated structural wall/ceiling panels in local pine were left exposed and all cable runs routered internally to avoid the need for further wall lining, hence reducing construction costs and increasing sustainability.


Whilst the external cladding was fabricated in local larch slats alike most typical barns in the region, all internal rooms, panelling and bespoke joinery items were manufactured in local pine to re-interpret a traditional typology but at the same time providing a modern timber interior and natural experience. Oak flooring was selected in conjunction with local limestone tiles for the rooms, whilst a terrazzo flooring was installed in the public reception area, where fitted joinery is upholstered in traditional and local virgin wool. Contractors were chosen from the local valley and materials sourced locally.


The hotel offers 18 rooms fitted with ensuites and balconies, a wellness, bike and ski store area in addition to a hotel bar and dining halls at ground floor level. An external garden with playground and sundeck complements the facilities.



Project team:


Client: Hotel Gardenazza
Architect: SIRS (Project Team: Manuel Irsara, Otto Irsara, Alberto Mozzato)
Structural Engineer / Health & Safety: Studio Tecnico Del Buono
Electrical Engineer: Studio GM
Mechanical Engineer / Fire consultant: Studio Delazer
Photographer: Gustav Willeit

24 users love this project
Comments
    comment
    user
    Enlarge image

    The existing building structure, nestled in the heart of the Italian Dolomites, consisted of two parts, the original front dating back to 1939 and a more recent rear extension from the 1990ies. The project scope consisted in replacing the aged 30ies structure with a new 5-storey low-energy building to provide contemporary hotel facilities with a 33 bed capacity as well as meeting current fire and building regulations, which the existing structure was not able to achieve. Basement and ground...

    Project details
    Archilovers On Instagram
    Lovers 24 users