New build office block | Flubacher_Nyfeler_Partner Architekten

Arlesheim, 2008 Arlesheim / Switzerland / 2008

0
0 Love 752 Visits Published

The new build office building stands in a prominent position and acts as a link between the residential area and the business park of the municipality of Arlesheim in the Basel region.


The glass cube stands out impressively in front of this background, rich in contrast, against the adjacent neighbouring city block development in clinker construction to form the desired, significant address. The building structure even stands out from the existing office buildings with its architectural language and use of materials.


The design is based on a simple, economical development and supporting structure. Highly flexible office spaces have been created over three upper floors.


 

0 users love this project
Comments
    comment
    user
    Enlarge image

    The new build office building stands in a prominent position and acts as a link between the residential area and the business park of the municipality of Arlesheim in the Basel region. The glass cube stands out impressively in front of this background, rich in contrast, against the adjacent neighbouring city block development in clinker construction to form the desired, significant address. The building structure even stands out from the existing office buildings with its architectural...

    Project details
    • Year 2008
    • Work started in 2007
    • Work finished in 2008
    • Status Completed works
    • Type Office Buildings
    Archilovers On Instagram