Borchen Sports Hall | Architekten Wannenmacher + Möller GmbH

Borchen / Germany / 2010

2
2 Love 2,210 Visits Published

The newly constructed sports hall was designed to accommodate the needs of the adjacent Primary School and of sports clubs in the municipality of Borchen.


 


Using the steeply sloping terrain this new building offers a simple, clear development concept that reacts to the varying flow of visitors. Spectators enter the building on the upper level without any barriers while sports players and schoolchildren enter the building through a second entrance on the lower level, opposite the primary school. The two entrances are connected outside the building by a ramp that runs parallel to it.


 


Galleries, air spaces and glass walls allow for many different sight lines within the building. The carefully placed window openings not only ensure pleasant, glare-free lighting in the central utility areas but also provide views over the surrounding landscape and views onto the sporting events in the hall.



Due to a tight budget the building was designed with a plaster façade that gives the monolithic structure a lively appearance with its slightly varying shades of grey in various areas and widths.


 


The outdoor areas are planned in such a way that the old and new buildings are interwoven with one another while retaining the existing topography and creating a varied network of paths between the neighbouring roads. The spaces in front of the building entrances are designed to attract visitors to spend time there.

2 users love this project
Comments
    comment
    user
    Enlarge image

    The newly constructed sports hall was designed to accommodate the needs of the adjacent Primary School and of sports clubs in the municipality of Borchen.   Using the steeply sloping terrain this new building offers a simple, clear development concept that reacts to the varying flow of visitors. Spectators enter the building on the upper level without any barriers while sports players and schoolchildren enter the building through a second entrance on the lower level, opposite the primary...

    Project details
    • Year 2010
    • Work finished in 2010
    • Status Completed works
    • Type Sport halls / Sports Facilities
    Archilovers On Instagram
    Lovers 2 users