Al Maharat Private School | M+N Architecture

3
3 Love 2,315 Visits Published

Arabic curriculum (MOE) school for 2000 students developed in three levels (G+2). The first level includes KG and Cycle 1 classrooms, second and third levels include classrooms of Cycle 2 and 3
with all requirements in terms of gender segregation and separate accesses.
School includes gym/multipurpose hall, kitchen and cafeteria, labs, music and art room, a library, ICT rooms, prayer rooms, outside sport facilities, indoor and outdoor breakout areas.
Outside areas includes staff parking, visitors parking, car and buses drop off areas.


------------------------------------------------------------------------------------------------------------------------------------------------------------------


Scuola a curriculum arabo (MOE) per 2000 studenti sviluppata in tre livelli (piano terra + 2). Il primo livello comprende asilo e scuola elementare, mentre il secondo e terzo livelli prevedono la scuola media e superiore, disegnate rispettando i requisiti in termini di separazione tra maschi e femmine e accessi separati.
La scuola comprende una palestra / spazio polifunzionale, la cucina e la mensa, laboratori informatici, laboratori di chimica, aula musica, laboratorio di arte, una biblioteca, stanze per la preghiera, impianti sportivi esterni, e aree ricreative all'aperto e al coperto.
Gli spazi all'aperto comprendono anche parcheggi per il personale, parcheggi visitatori ed aree di sosta breve.

3 users love this project
Comments
    comment
    user
    Enlarge image

    Arabic curriculum (MOE) school for 2000 students developed in three levels (G+2). The first level includes KG and Cycle 1 classrooms, second and third levels include classrooms of Cycle 2 and 3with all requirements in terms of gender segregation and separate accesses.School includes gym/multipurpose hall, kitchen and cafeteria, labs, music and art room, a library, ICT rooms, prayer rooms, outside sport facilities, indoor and outdoor breakout areas.Outside areas includes staff parking, visitors...

    Project details
    • Year 2015
    • Work finished in 2015
    • Main structure Steel
    • Client Al Maharat Private School
    • Status Current works
    • Type Kindergartens / Kindergartens / Schools/Institutes / Schools/Institutes / Sports Centres / Sports Centres / Sports Facilities / Sports Facilities / Interior Design / Interior Design / Custom Furniture / Custom Furniture
    Archilovers On Instagram
    Lovers 3 users