A clubhouse for VVW Blankenberge | B2Ai

Competition with invitation - laureate Blankenberge / Belgium / 2014

7
7 Love 2,206 Visits Published
For years now, the Vlaamse Vereniging voor Watersport (Flemish Aquatics Association) was in dire need of a new
clubhouse. The club received a 27 year concession for the lot at the end of the Oude Wenduinse Steenweg and the
Bevrij dingsplein, between the former sluice dock and the harbour channel.
The basic idea for the new clubhouse is the intertwining of water, land and tourism. Not only did they focus on
the layout, but also the functionality of the building, which will become a public attraction as well as a haven for
hikers.

Scenic context
Integration into its surroundings and the optimal use of the scenic prerequisites are the basic principle: the building follows the lines of its unique surroundings. Surfaces and volumes fl ow together and radiate an organic language.
On the inside, the various rooms bathe in rays of natural light. The terraces create the illusion of optical extension
of the landscape with a beautiful view of the coming and going of the ships and the marina. Nature interacts with
the building by the embedment in the landscape and the natural vista.

Architecture
The architectural concept interrogates both to nature and the environment, between the water and the land. The
dialogue between water and land creates a place – a point de vue – as a fossil of the movements at a junction of
streams and lines that intersect. The façade is in addition to this strikingly sleek design mainly characterized by the use of white architectural concrete.
All the facilities of the marina are located on the ground fl oor. The offi ce of the harbour master and his coworkers
are located at the head of the building with a panoramic view of the harbour channel and the marina. The restaurant with its outdoor terrace can be found on the southwest side of the building, basking in the sun with a
great view of the harbour channel.
On the first floor, there is a publicly accessible canteen. The bar is connected with the ground floor (with the
restaurant) by a void with an elevator and stairs, but can also operate separately.
The high design of the restaurant and bar section was elaborated in collaboration with interior architect Lieven
Musschoot.

Durable and fully accessible
The building will be used as a clubhouse for the aquatics association VVW Blankenberge and is accessible to
everyone. An elevator to the canteen and the terrace is available to make them accessible for the differently abled, as well as a specially modifi ed restroom with integrated shower facilities. All rooms, and especially the classrooms, are accessible via adequately wide doors and hallways. The environmental construction throughout the grounds and the entrances to the building are all done without thresholds.
Furthermore, there are a number of energetic durability aspects integrated into the concept: there is an HE
condensing boiler, ventilation is done with heat recovery, solar water heaters are used for warm water and the use
of the materials (concrete) ensures an extended trapping of the heat.
This is a building that has all the necessary potential to take up a central position in the societal happenings and to become a haven of working, relaxing and socialising.
The result is a unique and durable project ready for any potential growth and future perspectives.
7 users love this project
Comments
    comment
    user
    Enlarge image

    For years now, the Vlaamse Vereniging voor Watersport (Flemish Aquatics Association) was in dire need of a newclubhouse. The club received a 27 year concession for the lot at the end of the Oude Wenduinse Steenweg and theBevrij dingsplein, between the former sluice dock and the harbour channel.The basic idea for the new clubhouse is the intertwining of water, land and tourism. Not only did they focus onthe layout, but also the functionality of the building, which will become a public attraction...

    Project details
    • Year 2014
    • Work started in 2012
    • Work finished in 2014
    • Client Flemish Aquatics Association
    • Cost € 2,374,611.11
    • Status Completed works
    • Type Private clubs/recreation centres
    Archilovers On Instagram
    Lovers 7 users