Estádio Nacional Mané Garrincha | gmp Architekten
FIFA World Cup 2014 Brasília / Brazil / 2013
46
Concept and scheme design of roof + esplanade as well as detailed design of esplanade Castro Mello arquitetos with consultancy service provided by gmp and schlaich bergermann and partners Detailed design of roof gmp and schlaich bergermann and partners Design of bowl Castro Mello arquitetos, São Paulo
Brasília is the only city dating from the 20th century that has been declared a UNESCO World Heritage Site. With its range of public buildings, the “ideal city” built between 1956 and 1960 is one of the icons of the Moderne style. In this context gmp Architects, in cooperation with schlaich bergermann und partner (sbp), produced the design of the Brasília national stadium for Castro Mello Arquitetos (São Paulo). It was constructed in the place of the former Mané Garrincha stadium. Eduardo Castro Mello was responsible for the design of the 72,000-seat bowl; gmp and sbp produced the elevations of the esplanade as a characteristic “forest of columns”, and a double-skin suspension roof.
The objective of the design was a solution that does justice to the architectural history of the place, with a clear reference to the city’s tradition, and yet has its own distinct contemporary style.
As the city’s largest building, located on Brasília’s central axis, the composition was developed as a monumental building volume which integrates seamlessly into the urban design context. To achieve this, the stadium bowl is surrounded by an esplanade which comprises all access elements and supports the roof on its “forest of columns”. This clear gesture is emphasized by the minimalist, almost archetypal design of the components – the key material being concrete. The circular suspension roof is a doubleskin structure – the upper skin consists of a PTFE-coated glass fiber fabric while the lower membrane is made up of an openmesh, back-lit fabric.
Design Volkwin Marg and Hubert Nienhoff with Knut Göppert, 2008
Project Manager Martin Glass
Project Manager, Brazil Robert Hormes
Director of gmp do Brazil Ralf Amann
Team members (alphabetical) Ante Bagaric, Holger Betz, Rebecca Bornhauser, Carsten Borucki, Lena Brögger, Martina Maurer-Brusius, Kacarzyna
Ciruk, Laura Cruz Lima da Silva, Stefanie Eichelmann, Ruthie Gould, Florian Illenberger, Jochen Köhn, Martin Krebes, Helge Lezius, Tobias Mäscher, Adel Motamedi, Burkhard Pick, Jutta Rentsch Serpa, Lucia Martinez Rodriguez, Maryna Samolyuk, Florian Schwarthoff, Sara Taberner Bonastre
In cooperation with schlaich bergermann and partners, Stuttgart; Castro Mello arquitetos, São Paulo
Structural design of roof and esplanade schlaich bergermann and partners – Knut Göppert with Knut Stockhusen and Miriam Sayeg
Team members (alphabetical) Andreas Bader, Tiago Carvalho, Arnaud Deillon, Uli Dillmann, Stefan Dziewas, Hansmartin Fritz, Alberto Goosen, Hartmut
Grauer, Jochen Gugeler, Andreas Hahn, Achim Holl, Hubert Kunz, Christoph Paech, Jana Pavlovic, Bernd Ruhnke, Tilman Schober, Klaus Straub, Cornelia
Striegan, Peter Szerzo, Hiroki Tamai, Augusto Tiezzi, Feridun Tomalak, Chih-Bin Tseng, Gerhard Weinrebe, Rüdiger Weitzmann, Andrzej Winkler, Markus
Wöhrbach, Kai Zweigart
Structural design of stadium bowl Etalp, São Paulo
Services engineering – roof (concept and scheme design) b.i.g. Bechtold Ingenieurgesellschaft mbH; mha, São Paulo
Light concept – roof (concept and scheme design) Conceptlicht, Taunreut; Peter Gaspar, São Paulo; mha, São Paulo,
Seats approx. 72,800
Construction period 2010–2013
46 users love this project
Enlarge image
Concept and scheme design of roof + esplanade as well as detailed design of esplanade Castro Mello arquitetos with consultancy service provided by gmp and schlaich bergermann and partners Detailed design of roof gmp and schlaich bergermann and partners Design of bowl Castro Mello arquitetos, São Paulo Brasília is the only city dating from the 20th century that has been declared a UNESCO World Heritage Site. With its range of public buildings, the “ideal city” built between 1956 and 1960 is one...
- Year 2013
- Work started in 2010
- Work finished in 2013
- Main structure Reinforced concrete
- Status Completed works
- Type Stadiums
- Websitehttp://www.estadionacionaldebrasilia.com.br/portal/en