Chemistry Department of RWTH Aachen Aachen / Germany / 2014

0
0 Love 1,383 Visits Published
The new ‘Chemiepraktikum’ for the Chemistry Department of RWTH Aachen was officially handed over with the symbolic key delivery on 24 March. ksg implemented the new laboratory areas on behalf of BLB NRW. Since April 1, about 160 students can carry out research and experiments in the new building. Cologne, 25.04.2014 – After a preceding VOF procedure in 2011, kister scheithauer gross (ksg) implemented the new ‘Chemiepraktikum’ building for RWTH Aachen. The client is ‘Bau- und Liegenschaftsbetrieb NRW’. The monolithic building functions as a cornerstone of the existing development and is thus decisively contributing to the formation of a ‘prestigious address’ of the Chemical Institute. Laboratory areas of about 1,500 m² have been provided on a gross floor area of 3,720 m². Since April 1, students at the Institutes of Organic and Inorganic Chemistry of RWTH Aachen can now carry out research and experiments at 160 state-of-the-art fume cupboards. ‘Only at first sight the building seems to be a solitaire. Its polygenic shape precisely reacts to the urban planning situation and maintains the context through to the detailing of the material quality and colour of the façade. Sculpturally cut by the urban space, the plaster façade features a structure and flush punch windows in large metal frames, which form a contrast to the side façade. The building with a smaller floor area succeeds to achieve a new perception of the Chemical Institutes within the urban space’, architect Johannes Kister explains the design. The building was executed with a plastered façade on top of a composite thermal insulation system. The differentiation of the sides of the building is done through a varied treatment of the plaster surface. This mineral final coat was partly finished manually with an irregular pattern, partly executed as a classic, smooth plaster surface. The windows are differentiated according to circulation and laboratory areas. In the foyers, which are laid out as lobby areas on every floor, and in the staircase, floor-to-ceiling heat and solar protection glazing sitting flush with the façade offers views of the city. The post-and-beam elements are framed with large anodised aluminium plates. From the outside, the laboratory areas are distinguished by recessed ribbon windows with external shading devices. RWTH Aachen has financed the new building with 12.5 million Euros in total. Thanks to the very good and constructive collaboration of all parties involved in the project, the building could be quickly completed. Construction works were commenced in the summer of 2012. Project data: Adress: Melatener Straße/Turmstraße, 52074 Aachen Dates: 2011 - 2014 Construction dates: 06/2012 - 03/2014 Performance phases: 2-8 Gross floor space: 3.720 m² Building Owner: Bau- und Liegenschaftsbetrieb NRW, represented by branch office Aachen User: RWTH, Aachen Architects: kister scheithauer gross architekten und stadtplaner GmbH, Köln Entwurf/Verantwortlicher Partner: Prof. Johannes Kister Projektleiter: Klaus Küppers, Gabriel Mörsch General contractor_ Höhler + Partner Architekten und Ingenieure, Aachen Structural analysis: IDK Kleinjohann GmbH & Co. KG, Köln Building physics_ Krawinkel Ingenieure GmbH, Krefeld Laboratory planning: EUROLABORS Aktiengesellschaft für integrale Laborplanung, Kassel Fire safety: BFT Cognos GmbH, Aachen
0 users love this project
Comments
    comment
    user
    Enlarge image

    The new ‘Chemiepraktikum’ for the Chemistry Department of RWTH Aachen was officially handed over with the symbolic key delivery on 24 March. ksg implemented the new laboratory areas on behalf of BLB NRW. Since April 1, about 160 students can carry out research and experiments in the new building. Cologne, 25.04.2014 – After a preceding VOF procedure in 2011, kister scheithauer gross (ksg) implemented the new ‘Chemiepraktikum’ building for RWTH Aachen. The client is ‘Bau- und...

    Project details
    • Year 2014
    • Work started in 2012
    • Work finished in 2014
    • Client Bau- und Liegenschaftsbetrieb NRW, represented by branch office Aachen
    • Contractor Höhler + Partner Architekten und Ingenieure, Aachen
    • Cost 12.5 million Euros
    • Status Completed works
    • Type Research Centres/Labs