Patakis Publications New Office | ALEXANDRA KALLIRI and Associates Architects

Open House Athens 2014 Athens / Greece / 2008

1
1 Love 1,411 Visits Published
The building is situated in the old centre of Athens on a main street which joins the city with the main port Piraeus. It has a total surface of 1634 sqm on six floors (ground floor + 5 floors) with two basements for electromechanical equipment and parking area. The two main issues that this project is reexaminating are: -the revalorization of the open space as part of the building (and not as rest of the site) and -the relation between the urban and private space in the dense tissue of the old centre of Athens The building makes use of all the depth of the site and the interference of two patios, two gardens bring natural light and air to all the offices. All the facades to the patios are enclosed by glass partitions which give a visual connection between all the offices. On the ground floor the urban space penetrates into the private. Only a small part of the ground is covered for the building entrance and the rest, the arcade, the two patios and a terrace are open to the city. Through the open patios on the ground floor the urban space penetrates into the building. The patios are planted with mediterranean plants offering to the city a garden and a different value to the urban space. The urban façade of this part of the street does not present a relief. The curtain wall of the main façade is divided in horizontal strips which recess into the building and project over the street providing a fluid border between the urban and private space. At the same time they offer a play of shadows during the day and a play of light at night. Those projected boxes have a print of a work from the artist Bia Davou with words from Homer.
1 users love this project
Comments
    comment
    user
    Enlarge image

    The building is situated in the old centre of Athens on a main street which joins the city with the main port Piraeus. It has a total surface of 1634 sqm on six floors (ground floor + 5 floors) with two basements for electromechanical equipment and parking area. The two main issues that this project is reexaminating are: -the revalorization of the open space as part of the building (and not as rest of the site) and -the relation between the urban and private space in the dense tissue of the...

    Project details
    • Year 2008
    • Work finished in 2008
    • Client S. Patakis S.A.
    • Status Completed works
    • Type Office Buildings
    Archilovers On Instagram
    Lovers 1 users