Terminal container in Rijeka Harbour
Grandi Lavori Fincosit S.p.A. Fiume / Croatia / 2015
1
The Container Terminal at Zagreb Pier in Rijeka spreads
over 22 acres and provides a new 680 m long quay. It is designed to accomodate docking of 5 and 6 generation ships and to increase the load capacity of the existing Bradjica Terminal. The new terminal structure is built using 20 m deep submersed prefabricated caissons which are floated into position and guided by the GPS
1 users love this project
Enlarge image
The Container Terminal at Zagreb Pier in Rijeka spreads over 22 acres and provides a new 680 m long quay. It is designed to accomodate docking of 5 and 6 generation ships and to increase the load capacity of the existing Bradjica Terminal. The new terminal structure is built using 20 m deep submersed prefabricated caissons which are floated into position and guided by the GPS
- Year 2015
- Work started in 2011
- Work finished in 2015
- Client Autorità Portuale di Rijeka
- Contractor Grandi Lavori Fincosit S.p.A.
- Cost 110.000.000
- Status Current works
- Type Port Areas
comment